Ask Experts Questions for FREE Help !
Ask
    CuthbertRumbold's Avatar
    CuthbertRumbold Posts: 41, Reputation: 1
    Junior Member
     
    #1

    Sep 11, 2008, 06:22 PM
    New Bathroom DWV layout
    Hello all,

    I've been lurking in this forum for a while and I've learned a lot. Thanks to all you experts.

    I'm planning a new 1st floor bathroom. I'll be running a new 3" PVC drain line horizontally (1/4" per foot slope) in the basement from the main stack to the new bathroom about 15 feet away.

    I've made a sketch of the proposed layout here. The drawing does not show the vents - I'm intending to run 2" vent from both the lav and the washer; they would join in the ceiling and continue 2" up through the roof (this is a new vent in the roof).

    Is the toilet and the tub wet-vented properly with this arrangement or should I add more vents. The local code is UPC 2000. Anything else I should be worried about?

    Any other suggestions or comments are welcomed. Thanks very much!

    Roy
    ballengerb1's Avatar
    ballengerb1 Posts: 27,378, Reputation: 2280
    Home Repair & Remodeling Expert
     
    #2

    Sep 11, 2008, 06:32 PM
    Tom and Mark are better at rough ins but if you up that drain to a 4" you can reduce your slope to 1/8' p/f. Comes in handy if spacing is tight.
    CuthbertRumbold's Avatar
    CuthbertRumbold Posts: 41, Reputation: 1
    Junior Member
     
    #3

    Sep 11, 2008, 06:43 PM
    The stack is only 3", so no 4" here. Fortunately I have plenty of room, could probably even go steeper if I had to ;-). Thanks.
    truck 41's Avatar
    truck 41 Posts: 221, Reputation: 21
    Full Member
     
    #4

    Sep 11, 2008, 09:41 PM
    Hello, yes your drawing would work as a flat rough system, your washmachine drain and lav drain will be wet vents for your tub and toilet, just move the 3x2 combo tee for the washmachine within one foot from the tub drain tee.
    also when you install the tees for the washmachine and lav set the 2" branch on a 45 degree slope so your wet vent is higher than the 3" main trunk line then use the 1/8 bend elbow to level off and slope up to your stacks for the washmachine and lav drains.
    good luck ----Zeke----
    speedball1's Avatar
    speedball1 Posts: 29,301, Reputation: 1939
    Eternal Plumber
     
    #5

    Sep 12, 2008, 04:51 AM
    Good morning ,
    Sorry Cuthbert, but you fall under the UPC that don't allow wet vents and even ifv it did your tub would still be out of code. You can not discharge a major fixture (your toilet) past a unvented minor one,(your tub).
    Having said that, if you ran up vent in the wall behind your tub this might put you back in code. Milo and Growler both work on the West Coast Under UPC and they may have nore to say on the subject.. Regards, tom
    CuthbertRumbold's Avatar
    CuthbertRumbold Posts: 41, Reputation: 1
    Junior Member
     
    #6

    Sep 12, 2008, 05:10 AM
    OK, thanks Zeke... so something more like this drawing. The 2 combos slope up at 45 deg like you said and I run that 2" to the lav and washer up between the joists. Looks like I'll need to drill some joists then. How long does the 45 deg section need to be before I take the 1/8 bend back to horizontal? Thanks.
    CuthbertRumbold's Avatar
    CuthbertRumbold Posts: 41, Reputation: 1
    Junior Member
     
    #7

    Sep 12, 2008, 05:18 AM
    Quote Originally Posted by speedball1
    Having said that, if you ran up vent in the wall behind your tub this might put you back in code.
    Thanks Tom, I'm sure I can do that (add the vent line in the wall)... I'll think some more on it. Missed your post before I sent that last drawing ;-) Thanks again.
    speedball1's Avatar
    speedball1 Posts: 29,301, Reputation: 1939
    Eternal Plumber
     
    #8

    Sep 12, 2008, 05:21 AM
    Milo and Growler ought to be working your thread. You fall within one of the strictest codes this nation has. Berfore I did anything I would take my drawing down to your local Building Department and have them check it over. Good luck, Tom
    CuthbertRumbold's Avatar
    CuthbertRumbold Posts: 41, Reputation: 1
    Junior Member
     
    #9

    Sep 12, 2008, 06:06 AM
    That gets tricky because as a homeowner I'm not allowed to submit plans or pull a plumbing permit, only a licensed plumber can do that. Although I am legally allowed to do the actual work, go figure. Anyway, there is a potential can of worms there. But still, I want to do the work correctly.
    speedball1's Avatar
    speedball1 Posts: 29,301, Reputation: 1939
    Eternal Plumber
     
    #10

    Sep 12, 2008, 06:17 AM
    That gets tricky because as a homeowner I'm not allowed to submit plans or pull a plumbing permit, only a licensed plumber can do that.
    Sure am glad I work under The Standard Plumbing Code. If you got a plumber to pull the permit would you have to work under his supervision or could you do the job on your own? Cheers, Tom
    CuthbertRumbold's Avatar
    CuthbertRumbold Posts: 41, Reputation: 1
    Junior Member
     
    #11

    Sep 12, 2008, 09:44 AM
    Quote Originally Posted by speedball1
    If you got a plumber to pull the permit would you have to work under his supervision or could you do the job on your own?
    I could legally do it on my own.

    Back to the vent question (maybe the west coast guys will chime in), I can vent every single fixture if necessary, in fact the roof penetration is directly above that new wall that the WC and tub are on. Is it required to vent the toilet? And/or if I vent everything does that mean I don't need to roll the combos to 45 deg above horizontal (that would save drilling the joists)?

    Quote Originally Posted by speedball1
    you can not discharge a major fixture (your toilet) past a unvented minor one,(your tub).
    That makes perfect sense now that I think about it - the toilet would siphon the tub trap wouldn't it.

    Thanks.
    ballengerb1's Avatar
    ballengerb1 Posts: 27,378, Reputation: 2280
    Home Repair & Remodeling Expert
     
    #12

    Sep 12, 2008, 10:17 AM
    "Is it required to vent the toilet? " rule of thumb, if it drains it needs a trap, if it has a trap it needs a vent.
    CuthbertRumbold's Avatar
    CuthbertRumbold Posts: 41, Reputation: 1
    Junior Member
     
    #13

    Sep 12, 2008, 10:40 AM
    I shouldn't post while eating lunch ;-). I just meant does it need its own dedicated 'dry' vent. After re-reading a few things I believe it does. Thanks.

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Basement bathroom layout [ 6 Answers ]

Our unfinished basement has rough-ins for a toilet, sink and shower. I'm trying to determine if a small, 32 sq ft bathroom will be adequate or if the layout is too small. I could enlarge the space but the plumbing rough-ins really limit the "business" space in the room. I've uploaded digital...

Basement bathroom Layout [ 10 Answers ]

I am thinking of moving the basement laundry room and putting in a new bathroom. From reading all of the posts, I think I have a decent handle on what needs to be done. I have attached my proposed layout. Are there any problems with this? My one concern is the floor drain. I need some way...

Basement Bathroom Layout [ 1 Answers ]

Hello, I've attached the rough-in layout of my basement bathroom. Fortunately, I had pictures while the house was being built so I know the layout of plumbing underneath the slab. I've indicated these drain lines as well. Hopefully the picture and my probable misuse of terms in this email all...

PLanning stages of an updated bathroom - layout help [ 2 Answers ]

I bought an old house in another town 6 hours away from me. The distance poses many logistical problems so I may not be able to answer all the questions needed to get My answers right away, but Ill ask anyway :) Some info first. The house is old, Pier and beam. 2 Bedroom, 1 Bath. The current...


View more questions Search