    Basement bathtub - roughin
    I am finishing my basement, and will be installing a two or three piece tub / shower. My basement has been roughed in. There is a 2 inch pipe sticking out of the cement floor for the tub drain. Should there be a morter patch that I need to chip out in order to properly install the drain and overflow?

    Also, do I need to install aqua board behind the tub and shower, or can the 3 piece shower simply be attached directly to the studs?

    Thanks
    speedball1's Avatar
    speedball1 Posts: 29,301, Reputation: 1939
    Eternal Plumber
     
    #2

    Jan 29, 2008, 12:10 AM
    Should there be a morter patch that I need to chip out in order to properly install the drain and overflow?
    Yes! Tap around and see if it isn't just"skim cement " over the tub dap-out. If not, then you were roughed in for a shower and you will have to make a 12" square hole for the tub waste to connect to the trap raiser. The trap raiser shouls center about 15 1/2" off the wall and 1 1/2" off the front plate to pick up the average tub.
    do I need to install aqua board behind the tub and shower, or can the 3 piece shower simply be attached directly to the studs?
    A plumbers job is done when he installs the shower valve, pan and drain. But I'm hoping one of our other experts will pick up on this and answer. Regards, Tom
    massplumber2008's Avatar
    massplumber2008 Posts: 12,832, Reputation: 1212
    Senior Plumbing Expert
     
    #3

    Jan 29, 2008, 05:34 AM
    Speedball1 has got you started... sounds like a shower rough in to me as well. Dig out around pipe and see if it heads into a 2" p-trap... may need to move slightly and reduce pipe size to fit to a tub (see Speed's numbers... then measure on your tub or get a specification sheet from the supplier that sold it to you and check that for rough in measurements).

    Then, install the tub and shower walls AGAINST the studs. If you want a superior job--->>> who doesn't --->>> Then I would set this tub in a modified thinset mortar or a structolite gypsum base to reduce creaking/crackling inherent in these type of tubs.

    Usually takes 2-50lb bags minimum. Easy to do... (no plastic needed on floor as floor is cement)... just mix and pour in the footprint that your tub makes at the floor... will need to look under tub before starting and see how much height you need... usually slopes toward drain... add 1-2 inches higher than the bottom of tub and then lower unit and squish out the excess by shifting/shaking unit down and into place. I have mixed a couple batches a little thick and had to step in to finally lower unit to floor. I promise you it will be worth the hassle!!

    BUT.. you do not have to do the mortar/structolite... not everyone does it... OR some just do it for shower bases... we do it for anything acrylic or fiberglass... even whirlpools!

    Hey, any more questions//let us know. Good luck.

    If answer was helpful, please RATE THE ANSWER. Thank you.

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Basement roughin [ 5 Answers ]

I finished putting in a basement roughin for a bathroom (drains and toilet )now it is time to cover the pipes I laid with cement. How do I do this. Do I cover the pipe with (sand or gravel ) then poor cement or will this create a sag where ever I poor the cement , or do I just poor cement in...

Basement roughin finish [ 1 Answers ]

I finished putting in a basement rough in for a bathroom now it is time to cover the pipes I laid with cement. How do I do this. Do I cover the pipe with (sand or gravel ) then poor cement or will this create a sag where ever I poor the cement , or do I just poor cement in the cavity level with...

Basement Roughin [ 7 Answers ]

I have noticed numerous questions so I thought I would ask mine. I have attached a "rough" diagram of the basement. I am trying to determine where the vanity drain would be. I think it should be by the X. It is cast below the foundation and pvc above. I am assuming I need to cut by the x and put a...

Basement Roughin 3 piece ? [ 5 Answers ]

Hi there, I have attached a picture, is this a 3 pce roughin? I can see the toilet, and the tall pipe for water, what about a drain for the shower? What should I see for a normal 3 pce roughin. We also have infloor heating pipes laid, and haven't hooked up the boiler yet. But what options are we...

Basement Bathroom Roughin [ 5 Answers ]

I have home that is 8yrs old. The basement was roughed in for a toilet only and now I would like to add the shower and sink before closing everything off. The problem is the rough in for the sink and shower do not exist. The toilet is currently about 8' from the main soil stack that comes from...