I have noticed numerous questions so I thought I would ask mine. I have attached a "rough" diagram of the basement. I am trying to determine where the vanity drain would be. I think it should be by the X. It is cast below the foundation and pvc above. I am assuming I need to cut by the x and put a t into connect to the sink drain. Ptrap of course , etc. The shower drain needs to be moved over about 2 feet. It must have a p trap under the slab since it holds water. What is the easiest way to connect pvc to cast? It looks like they used some type of slip fitting inside the cast with epoxy to hold it? ANy help is appreciated Thanks
|
|
 |
Ultra Member
|
|
Feb 12, 2007, 10:59 PM
|
|
 Originally Posted by cdx2
I have noticed numerous questions so I thought I would ask mine. I have attached a "rough" diagram of the basement. I am trying to determine where the vanity drain would be. I think it should be by the X. It is cast below the foundation and pvc above. I am assuming I need to cut by the x and put a t into connect to the sink drain. Ptrap of course and etc. The shower drain needs to be moved over about 2 feet. It must have a p trap under the slab since it holds water. What is the easiest way to connect pvc to cast? It looks like they used some type of slip fitting inside the cast with epoxy to hold it? ANy help is appreciated Thanks
I would be concerned if your drawing is accurate.
Connect pvc to cast iron with black rubber connectors having hose clamps that comes with.
|
|
 |
New Member
|
|
Feb 13, 2007, 07:59 AM
|
|
What is the concern? It was union plumbers who did the rough in. I have not had a chance to call them yet.
|
|
 |
Ultra Member
|
|
Feb 13, 2007, 10:34 AM
|
|
According to your drawing, the toilet is flowing by the tub/shower with no vent. This is not legal and it causes a suction on the tub trap to empty the trap
|
|
 |
New Member
|
|
Feb 13, 2007, 12:00 PM
|
|
My drawing may be off since I did not see the toilet drain before they poured the slab. I will call them to confirm but I think the toilet goes to the ejector pump and vents through the vent before the pump. If so would the x be the correct location for the vanity drain
|
|
 |
Eternal Plumber
|
|
Feb 13, 2007, 01:32 PM
|
|
Hold the phone! If the drawing reflects what's under the slab then you're in deep doo-doo.
First off, as Doug pointed out, you are discharging a major fixture mast a unvented minor one and you can't do that.
Second, yiou have combined the fixture vent with the dedicated ejector pit vent. Dedicated means just that. The pit vent MUST be separate from the house system.
Thirdly, The loop that you've placed the X on is unnecessary. The vanity can drain into either of the raisers shown.
Sorry I couldn't be more supportive. Regards, Tom
|
|
 |
Ultra Member
|
|
Feb 13, 2007, 05:04 PM
|
|
My faith in the competency of Union Plumbers has been even further eroded.
|
|
 |
New Member
|
|
Feb 15, 2007, 08:38 AM
|
|
The plumbers will be coming out next week to go over the setup with me. I will update post when I have all the info from them
|
|
Question Tools |
Search this Question |
|
|
Add your answer here.
Check out some similar questions!
Basement Roughin 3 piece ?
[ 5 Answers ]
Hi there, I have attached a picture, is this a 3 pce roughin? I can see the toilet, and the tall pipe for water, what about a drain for the shower? What should I see for a normal 3 pce roughin. We also have infloor heating pipes laid, and haven't hooked up the boiler yet. But what options are we...
Basement
[ 3 Answers ]
Hi- We are starting to refinish our basement and we don't have any problems with water. The basement is poured concrete we are finishing about half of the space. I framed the walls with steel studs and purchased but have not hung yet green board Sheetrock that was recommended by our local lumber...
New bathroom roughin
[ 6 Answers ]
I just bought a house with an unfinished second floor. The bathroom has a 3" soil stack roughed in and stubbed, but thats it. The first floor stack vent is closeby, so theres no problem continuing the second floor stack to meet the venting the first floor stack.
The problem is that the soil...
Basement
[ 1 Answers ]
Hello there well I am trying to put a washer in my basement but the sewer line is on the other side of the house from where it will be put so I am asking how should a go about running the drain line without cutting a hole in the floor I have herd about a sump pump and a tank but was not sure if...
Basement Bathroom Roughin
[ 5 Answers ]
I have home that is 8yrs old. The basement was roughed in for a toilet only and now I would like to add the shower and sink before closing everything off. The problem is the rough in for the sink and shower do not exist. The toilet is currently about 8' from the main soil stack that comes from...
View more questions
Search
|