    Hi everybody,

    I am currently finishing my basement and am planning on installing a half bathroom, but I'm unsure about the toilet.

    I have two issues with the toilet.

    1. The pipe going into the cement is WAY too close to the walls for me to actually sit the toilet on top of it. What are my options here?

    I've attached an image to show the proximity of the pipe to the walls. Sorry about the bad picture - I had just taken this for the progress. If somebody needs a closer picture of the pipe, I can definitely do that at some point tonight.

    2. I've been reading a lot about a toilet below grade, and possibly needing an upflush toilet. Is there anything I should be looking for to know if I do need that or not?

    Any help would be greatly appreciated!
    Thanks in advance
    Dave

    As a follow up, the pipe is 6" from the back wall and 9" from the side wall (from the center of the pipe).

    Thanks
    Dave
    Attached Images
     
    ma0641's Avatar
    ma0641 Posts: 15,675, Reputation: 1012
    Uber Member
     
    #2

    Oct 4, 2013, 01:49 PM
    It was installed not considering the new inside wall. Looks like a 10 or 12" prior to the walls. Make a niche and set the toilet in it.
    AsianDave's Avatar
    AsianDave Posts: 4, Reputation: 1
    New Member
     
    #3

    Oct 4, 2013, 02:03 PM
    Quote Originally Posted by ma0641 View Post
    It was installed not considering the new inside wall. Looks like a 10 or 12" prior to the walls. Make a niche and set the toilet in it.
    Everything was roughed in when I moved in, so it may have been overlooked. I'm not entirely sure what you mean by "make a niche" though.

    Would it be possible for you to explain further? Or perhaps point me to a website that would have an example? I just did a Google search and didn't really find anything relevant.

    Thanks!
    Dave
    massplumber2008's Avatar
    massplumber2008 Posts: 12,832, Reputation: 1212
    Senior Plumbing Expert
     
    #4

    Oct 4, 2013, 03:51 PM
    Hi Dave

    I think you should simply chip up the floor around the toilet pipe and extend it over to where you want it to go. I say, "simply" because it really is pretty simple! Here, you rent a jackhammer (and purchase ear/eye protection) and chip out the floor around the pipe and make a channel over to where you want to extend the pipe. Purchase a couple couplings (or fittings) and extend the pipe... backfill, smooth over with new concrete and you are done. Overall, it shouldn't take more than 4-8 hours max!

    I think this is the only correct answer here! Finally, you do NOT need an upflush toilet... ;)

    Back to you...

    Mark

    PS: Is this plumbed up for a tub or shower? Let me know, OK?
    ma0641's Avatar
    ma0641 Posts: 15,675, Reputation: 1012
    Uber Member
     
    #5

    Oct 4, 2013, 06:32 PM
    Quote Originally Posted by AsianDave View Post
    Everything was roughed in when I moved in, so it may have been overlooked. I'm not entirely sure what you mean by "make a niche" though.

    Would it be possible for you to explain further? Or perhaps point me to a website that would have an example? I just did a Google search and didn't really find anything relevant.

    Thanks!
    Dave
    I had a similar situation when the load bearing wall was put on the wrong side of the line. Rather than cut the slab, I cut the wall and put the drywall on the back of the stud. Then I framed an arched opening and a regular 12" rough in toilet. Toilet sets back 4" into the wall.
    AsianDave's Avatar
    AsianDave Posts: 4, Reputation: 1
    New Member
     
    #6

    Oct 7, 2013, 06:40 PM
    Hi Mark,

    Thanks so much for the advice. I agree with you that this is really the only way to do it properly. Although I don't feel super comfortable jackhammering the floor myself - it sounds relatively easy, so I could likely get somebody in to do it for me.

    I don't have it plumbed for a tub or shower... does that make a difference?

    Cheers
    Dave


    Quote Originally Posted by massplumber2008 View Post
    Hi Dave

    I think you should simply chip up the floor around the toilet pipe and extend it over to where you want it to go. I say, "simply" because it really is pretty simple! Here, you rent a jackhammer (and purchase ear/eye protection) and chip out the floor around the pipe and make a channel over to where you want to extend the pipe. Purchase a couple couplings (or fittings) and extend the pipe...backfill, smooth over with new concrete and you are done. Overall, it shouldn't take more than 4-8 hours max!

    I think this is the only correct answer here! Finally, you do NOT need an upflush toilet...;)

    Back to you...

    Mark

    PS: Is this plumbed up for a tub or shower? Let me know, OK?
    AsianDave's Avatar
    AsianDave Posts: 4, Reputation: 1
    New Member
     
    #7

    Oct 7, 2013, 06:41 PM
    Thanks for the response ma0641!

    This could definitely work, but I don't think the wife would go for it :) Thanks again though!

    Quote Originally Posted by ma0641 View Post
    I had a similar situation when the load bearing wall was put on the wrong side of the line. Rather than cut the slab, I cut the wall and put the drywall on the back of the stud. Then I framed an arched opening and a regular 12" rough in toilet. Toilet sets back 4" into the wall.
    massplumber2008's Avatar
    massplumber2008 Posts: 12,832, Reputation: 1212
    Senior Plumbing Expert
     
    #8

    Oct 8, 2013, 05:00 AM
    Hi Dave

    You could always go to a local unemployment agency and see if they have someone they know a little bit looking for a days work (just an idea)...

    And the plumbing for a tub or shower doesn't make a difference to anything... just that if you are going to be opening the floor up it wouldn't be too hard to install a drain/vent for a tub/shower at that time. I just thought I would mention it in case you had not considered it is all!

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Basement toilet just replaced sewage pump now toilet does not flush [ 1 Answers ]

Just replace sewage pump for basement bathroom on Sunday, all seems to be working fine. The toilet would not pull the water down/flush.

Difference between standard toilet and basement floor toilet [ 23 Answers ]

I need to know the difference of a basement floor toilet and standard one so I can order it! How do I measure the rough in without takg the toilet off the floor right now?

Basement Toilet [ 3 Answers ]

I am finishing the roughed in bathroom in my basement and the riser for the toilet was placed at 16 inches from the studs when the builder did the rough in. I understand that the riser should be 12" from the finished wall. I believe my only options are: 1) Build the wall out 3.5 inches or ...

Toilet in basement [ 1 Answers ]

Hi, I would like to put in a toilet in my basement, I have a drain for a shower. My question is can I tie into that drain. The drain is connected to city sewer.

Basement toilet bubbles when upstairs toilet is flushed and washer drains. [ 1 Answers ]

Hi, Just recently (last few days) my toilet in the basement bathroom has begun to bubble. This is caused when one of the upstairs toilets (directly above it) flushes but not another one upstairs. It also bubbles quite rapidly when the clothes washer drains. The washer is located in the...


View more questions Search