    Basement Toilet
    I am finishing the roughed in bathroom in my basement and the riser for the toilet was placed at 16 inches from the studs when the builder did the rough in. I understand that the riser should be 12" from the finished wall.

    I believe my only options are:

    1) Build the wall out 3.5 inches or

    2) Break out the slab and reposition the roughed in plumbing.

    I'm just wondering if there are any other options available.

    Thanks
    mygirlsdad77's Avatar
    mygirlsdad77 Posts: 5,713, Reputation: 339
    Plumbing Expert
     
    #2

    May 18, 2009, 03:09 PM

    You could buy a 14 inch toilet. But that will still leave you 1 1/2 from finished wall. If you can live with this, then I would say its your best option. If you want the toilet to set closer to the wall, then furring the wall out is your next best bet. I would do this before breaking concrete and moving drain. Keep in mind, 14" rough toilets are a bit pricey, so if you are going to furr the wall, i would stick with a 12" toilet and furr the wall with 2x4s.

    Just my personal opinion>>> I would get a 14 toilet and live with the gap between tank and wall.

    Please let us know what you decide.
    mygirlsdad77's Avatar
    mygirlsdad77 Posts: 5,713, Reputation: 339
    Plumbing Expert
     
    #3

    May 18, 2009, 03:11 PM
    If flange is not installed yet, you may be able to use an offset flange also. This would require chipping some concrete, but not much. You would also have to have enough vertical pipe between floor and closet bend.
    massplumber2008's Avatar
    massplumber2008 Posts: 12,832, Reputation: 1212
    Senior Plumbing Expert
     
    #4

    May 18, 2009, 04:04 PM
    Hi all:

    I would chip out a bit of the concrete and install an offset flange (see picture) in this case. The offset flange will set the flange back between 1.5" to 2"... depending on the offset flange purchased (obviously the 2" is best here). Then, purchase a 14" rough-in toilet as presented by Mygirlsdad77 and you should be all set here... ;)



    Let us know if you have more questions...

    MARK
    Attached Images
     

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

New toilet in basement [ 2 Answers ]

Hi I'm planning to install a toilet in the basement. I have digged the basement floor and here is how the piping looks like inside the floor ( please see image ). The image shows the location of the new toilet and the proposed venting. To my surprise the pipes do not go very deep underneath...

Plumbing-basement toilet [ 1 Answers ]

The flange is about 3/8 above the floor and the toilet rocks side to side. How can I fix this. There is very little room to cut the cpvc to install another flange. Any suggestions are appreciated.

Toilet in basement [ 3 Answers ]

Hello, I am going to put a full bathroom in my basement, do I need an injector pump?

Toilet in basement [ 1 Answers ]

Hi, I would like to put in a toilet in my basement, I have a drain for a shower. My question is can I tie into that drain. The drain is connected to city sewer.

Basement toilet bubbles when upstairs toilet is flushed and washer drains. [ 1 Answers ]

Hi, Just recently (last few days) my toilet in the basement bathroom has begun to bubble. This is caused when one of the upstairs toilets (directly above it) flushes but not another one upstairs. It also bubbles quite rapidly when the clothes washer drains. The washer is located in the...


View more questions Search