Uses of schedule 40 PVC pipe
[ 1 Answers ]
A couple of questions: 1. Can/should schedule 40 glueless PVC pipe be used for natural gas on 1000 ft run? 2. I am told that natural gas lines have to be marked with wire wrap. If so, what kind of wire. 3. Can water and gas lines be safely placed in the same trench? Thanks
What are Schedule 40 and Schedule 80 ratings for pipe?
[ 15 Answers ]
Ok, pvc is temperature restricted to 140 F so no hot water, cpvc can be used in the house. What is schedule 40 and schedule 80?
Can Schedule 40 pvc pipe be used to convey potable water in a public right-of-way
[ 1 Answers ]
I'm trying to run 1-1/2 to 2" Sch. 40 pvc to convey potable water from a well to my house. It will be installed in a trench at the edge of a country road right-of-way, 10 feet away from the barrow ditch, 15 feet away from the road surface (which is dirt). My local government jurisdiction is...
Schedule 40 & Schedule 80 Pipe?
[ 1 Answers ]
I am curious what the difference is between Schedule 40 & 80 pipe? And where/when is it used? Also if someone could also help me regarding Class 200 & Class 315 pipe, and Solvent Weld pipe I would greatly appreciate it. Thanks.
Crush strength of schedule 40 pvc pipe
[ 3 Answers ]
I'm planning on using 4" pvc schedule 40 pipe for a waste line which will be located approx 24" under our driveway. On occasion we have very heavy triaxle trucks using the drive way. Am I okay with the schedule 40 pvc for it's strenght not to crush from the weight of the trucks? Some folks... View more questions Search
|