New Member
|
|
Aug 29, 2013, 06:37 PM
|
|
Is this plumbing sequence correct?
I am doing a major mbath remod from a rank amateur position. You have graciously answered my questions along the way thank you.
I would like to see if I have done my homework correctly.
I have excavated dirt from under the slab in excess of where the concrete was removed to get added room to work.
The picture illustrates the piping sequence for the new shower drain. I want to be sure I do it correctly, and hence have the following questions
1) Is there a minimum amount of pipe from the floor drain to the p trap (seems like I have read 7)
2) Is there any problem using the 22.5 degree (1/8 turn) coupling to help with fall and direction to the existing line? - I read there should be no 90 after a p trap - is my pictured set up OK?
3) What is the best way to reattach the new wye fitting to the line (2pvc) the must be cut to insert the wye
a. The shielded coupling will that rubber/ metal deteriorate once it is buried and cemented over?
b. The repair coupling have read these are very hard to glue and get into proper position is that also true in the 2 size?
4) Can I use a sanitary T instead of the wye ( It will give me a bit more room to work)
5) Is it OK that the vent steps down from 2" to 1.5 inch above the (to be capped) sink drain?
|
|
 |
Ultra Member
|
|
Aug 30, 2013, 02:17 AM
|
|
Hi mlb, one of the expert plumbers will be along to critique your work. I just wanted to comment on the photographic work, outstanding.
|
|
 |
Senior Plumbing Expert
|
|
Aug 30, 2013, 11:06 AM
|
|
Hi all
1) Not really a minimum length issue here as you need to install the PTRAP and connect it to the shower strainer so don't worry about length here... should be all set.
2) 22.5 degree fitting is fine (correct on no 90).
3) Repair coupling and shielded clamp is perfect and no, the shielded clamp is fine underground!
4) No sanitary tee allowed on the horizontal piping... need to use the combo. Wye that you have.
5) In definitions of wet venting the "wet vent" you are connecting into should be full size 2" (or larger) all the way through the roof. Should you change it over to 2"? Probably, but if you don't I think you'll be just fine in the long run!
Looking good!
Mark
|
|
 |
New Member
|
|
Aug 30, 2013, 11:50 AM
|
|
Mark,
Thanks for the generousity of your time.
One point of clarification - when reattaching to the original drain ( after "splicing" in the wye) - should I use
a) the repair coupling ( concern is with a good glue job) or
b) the shielded coupling? (concern was deteriouation with time and no future access)
Or do you suggest somehow using both?
Thanks again you are appreciated
|
|
 |
Senior Plumbing Expert
|
|
Aug 30, 2013, 01:31 PM
|
|
Above ground (and underground), some would use the repair clamp and the shielded clamp, but with the tight space you have there (and inexperience with repair couplings), I'd suggest using two shielded clamps here... will make the job super quick/easy!
The trick here is to put pieces of pipe into the combo. Wye and then install the rubber sleeves onto the pipe and then "flip" the rubbers back on themselves. Slide the SS clamps over the pipe ends in the ground, drop the fitting with flipped sleeves into place, flip the rubber sleeves onto the pipe and slide clamps into place and tighten appropriately. The example below shows a wye fitting and adds a 1/2" extra to be removed from the pipe so the RIB in the clamps can be accounted for.
Make sense?
Mark
|
|
 |
New Member
|
|
Aug 30, 2013, 01:34 PM
|
|
Yes thank you
|
|
 |
New Member
|
|
Sep 4, 2013, 11:09 AM
|
|
I have (most) every thing dryfit -
Will it be OK if I glue the wye to pipe and then use a section of pipe on one side of the wye with two clamps?
Reason is that the wye is tight on the one side.
If necessary I will remove more concrete to create added space on the other of the wye.
I am not in a hurry - I want to be sure to do it once and do it right.
Thanks for all of your support
|
|
 |
Senior Plumbing Expert
|
|
Sep 4, 2013, 11:40 AM
|
|
If that is how you need to do it, then that should be just fine!
|
|
 |
New Member
|
|
Sep 4, 2013, 01:49 PM
|
|
 Originally Posted by massplumber2008
If that is how you need to do it, then that should be just fine!
Thanks for your help!
|
|
Question Tools |
Search this Question |
|
|
Add your answer here.
Check out some similar questions!
Moving Bathroom Waste Plumbing Design Venting Correct?
[ 13 Answers ]
I am moving our bathroom from one end of the lower level (concrete slab) of our 4 level split to the end that is closer to the stairway to the levels. The lowest level is the basement. I will be able to tie into the existing 4 drain line and the 2 vent that runs up through the higher level to...
What is correct way to bleed air from well water system to correct noise?
[ 2 Answers ]
Since installing new flush valve, the toilet increasingly (randomly) is surging as it fills. Is it likely that the flush valve is allowing air to enter the system; it appears to be functioning properly?
Our well service company said our pressure tank is not the problem, and the other two homes...
Matching up the correct capacitor with the correct condenser fan motor?
[ 4 Answers ]
How crucial is it to match the right capacitor to the right condenser fan motor? If you have the wrong capacitor, can this cause the motor to stop after running for a while, say 20 or 40 minutes? It would start up again, but would allways stop. The specs for the motor are: Emerson E-line, model no...
Correct plumbing of a shower valve
[ 1 Answers ]
I bought a single handle shower valve and the hot and cold inlets are not marked. Is the hot ALWAYS the left and cold ALWAYS the right?
Thanks for your help
View more questions
Search
|