New Member
|
|
Mar 22, 2013, 12:39 PM
|
|
Wire size
I'm doing a re-wiring job, the last guy that wired this house back in 1978, (it was built in 1932), used 14awg to feed a stove & a fridge, yes on the same cct (circuit). The basement is fed off 1 cct for power & it's lighting. Washer dryer is on its same cct.. my question? Is this- What the going rate to run 8 circuits in Colorado? I've asked, searched, to no satisfaction. I've landed up here in hopes you may be able give me a general idea!
|
|
 |
Uber Member
|
|
Mar 22, 2013, 02:04 PM
|
|
There is no way to tell "going rate" How much wire, access, type of wire, holes to drill etc.
|
|
 |
Printers & Electronics Expert
|
|
Mar 22, 2013, 04:54 PM
|
|
Also, you may have to get the service increased to meet minimum code for your area. The NEC Minimum is still 100 amps.
As to the rates, you need to correctly size the full scope of the necessary work. Then determine the supplies you need and determine how much profit you want on the supplies and how much on the labor. There is no scale or prexisting formula for calculating your bid.
If you are an electrical apprentice, why aren'tyour journeyman or master asisting you
|
|
 |
Printers & Electronics Expert
|
|
Mar 22, 2013, 05:17 PM
|
|
Just one additional thought, is this home a Historial Landmark?
|
|
 |
New Member
|
|
Mar 23, 2013, 09:54 AM
|
|
[QUOTE=donf;3425480]Also, you may have to get the service increased to meet minimum code for your area. The NEC Minimum is still 100 amps.
As to the rates, you need to correctly size the full scope of the necessary work. Then determine the supplies you need and determine how much profit you want on the supplies and how much on the labor. There is no scale or prexisting formula for calculating your bid.
If you are an electrical apprentice, why aren'tyour journeyman or master asisting you[/QUOT
----------------------------------------------
Thank you donf... the service is already upgraded. 15 years ago the other electrical contractor tied too much into 1-2 circuits, also, the home owner is purchasing all materials. I'm just providing labor. As far as 'Apprentice' I been doing electrical for 7 years now, this is just my biggest job as of yet. 2 past employers still as of yet need to get back to me on my 'recorded hours (2,600)' bettween the two.
|
|
 |
New Member
|
|
Mar 23, 2013, 09:55 AM
|
|
 Originally Posted by donf
Just one additional thought, is this home a Historial Landmark?
-----------------------------------------------------------
No it isn't
|
|
 |
Ultra Member
|
|
Mar 24, 2013, 08:54 AM
|
|
You can always charge byu the hour... that way it's a fair deal for all.
|
|
Question Tools |
Search this Question |
|
|
Add your answer here.
Check out some similar questions!
Wire size & conduit size for 60 am subpanel 150 from source
[ 9 Answers ]
Indiana question:
I want to install a 60amp subpanel 150 feet from the main panel. This is all exposed runs both inside and out in a commercial envirenement.
What gauge and type of copper wire and what size conduit whould I use. How often should insert a junction box in the run.
John
Sub Panel AMP Size and Supply Wire Size
[ 1 Answers ]
I would like to install a sub panel in my garage I was told to run 6/3 Romex to supply the sub panel and have done so. The run is about 65 feet and I am now wondering after reading this site what is the max I can get for this size wire? I plan to supply a compressor (20 amp) and the garden...
View more questions
Search
|