    Basement bathroom
    I recently purchased my first home, it is a town home with an unfinished rear walkout level basement. I would like to finish out the basement to include a laundry room, full bathroom and a living/recreation area with the possibility of a wet bar (all this will take time and I know that, as this initial plan might seem a little ambitious). The home was built in 1990 and has rough-ins for a half bath (toilet and shower). I was wondering how hard and if at all possible to add what it needed for a shower or tub. Also I would like to plan for the future and would like to add the drain for a wet par in the future. In insight as to how difficult converting the half bath rough-in into a full bath would be and if I would be able to add another drain for the wet bar in the future. Thank you for you time.
    speedball1's Avatar
    speedball1 Posts: 29,301, Reputation: 1939
    Eternal Plumber
     
    #2

    Jan 18, 2008, 12:27 PM
    You will have to break up the floor and tap into the main to pick up your laundry and bar sink. They both will have to be vented. As a rule half baths are roughed in for a toilet and vanity. Are you sure you didn't mean a bathroom sink when you told me it was roughed for a toilet and shower? If the 2" pipe is near a wall then it's a lavatory rough in and you will be able to tie the shower drain to thelav drain and let it be wet vented by it. Cheers, Tom
    RAS13694's Avatar
    RAS13694 Posts: 3, Reputation: 1
    New Member
     
    #3

    Jan 18, 2008, 12:37 PM
    My mistake, I did mean bathroom sink I don't know why I put shower. I would like to add a drain for a shower. The laundry is already plumed in the basement, so it I would just need to finish off a room where they are located. I've been reading up on where stuff gets plumed to and I am confused about a major fixture going past an un-vented minor fixture. Where would be the best place to tie into?

    Rob
    speedball1's Avatar
    speedball1 Posts: 29,301, Reputation: 1939
    Eternal Plumber
     
    #4

    Jan 18, 2008, 01:31 PM
    I've been reading up on where stuff gets plumed to and I am confused about a major fixture going past an un-vented minor fixture. Where would be the best place to tie into?
    ALL fixtures that are trapped will have to be vented out the roof or revented back into a dry vent. The only exceptions are wet vented fixtures such as your new shower. What are your concerns? Tom
    RAS13694's Avatar
    RAS13694 Posts: 3, Reputation: 1
    New Member
     
    #5

    Jan 18, 2008, 01:33 PM
    So if I just tie into the lav drain I should be OK?

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Bathroom plumbing with basement bathroom [ 1 Answers ]

Could you please tell me what cause my upstairs bathroom to back up into my basement bathroom?

Basement Bathroom [ 1 Answers ]

I'm in the process of installing a new bathroom in my basement here in Milton Ma. The house was built in 1870 and already had a toilet in the basement. After busting up the old concrete and digging up the dirt to prepare for the laying of the various tub, sink and toilet drain pipes, I came to the...

Bathroom in the basement [ 1 Answers ]

I recently purchased a house with an unfinished basement. I ve been thinking about finishing the basement and installing a bathroom down there. My question is how would I go about doing that. The waste line runs underneath the cement floor. I think it is made of cast iron but I'm not exactly...

Basement bathroom [ 1 Answers ]

We are looking to install a basement bathroom using an ejector pump. Any recommendations? Can the sink and shower stall be install to pump?

Basement bathroom [ 3 Answers ]

I am installing a new bathroom in our basement. The house is about 2 years old. The builder insists the rough-in is ready to go but I am not so sure. The attach pictures show the right and left sides of the room from the entrance perspective. I will be placing a 72" shower pan with glass block...


View more questions Search