    Wall around boiler in basement addition
    Hello all!

    My name is Jim, and I would like to "box in" the heater (gas boiler) and gas HWH in my basement.

    My question is clearance. How close to a gas boiler should I be for safety.

    The "wall" will have two large removable panels to allow for access. The "boxed in" room will be fully vented for airflow.

    Thanks,

    Jim
    Flying Blue Eagle's Avatar
    Flying Blue Eagle Posts: 2,056, Reputation: 225
    Ultra Member
     
    #2

    Oct 15, 2007, 06:09 PM
    JIMBO - IF it was me I would leave at least 12" to 18 " space between the wall and hot water tank . IA'm glad you are going to make it a vented room , Being a GAS boiler I think you need to check to see what restrictions they. Please remember that gas fumes do rise up ward stay safe::::
    Flying Blue Eagle's Avatar
    Flying Blue Eagle Posts: 2,056, Reputation: 225
    Ultra Member
     
    #3

    Oct 15, 2007, 06:09 PM
    JIMBO - IF it was me I would leave at least 12" to 18 " space between the wall and hot water tank . IA'm glad you are going to make it a vented room , Being a GAS boiler I think you need to check to see what restrictions they. Please remember that gas fumes do rise up ward stay safe::::

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

BAsement Bath addition [ 1 Answers ]

I plan to add a bath in my basement. However, there is not a rough in. The house's plumbing is connected to a septic system. The pipe going out to the septic is located about halfway up the basement wall. The plumbing from the upstairs is exposed, as the basement is not finished. However, I...

Leeking basement wall [ 1 Answers ]

House was build in 1909. First four courses are glazed tile blocks above that there are cinder blocks. The tile blocks are hollow and the morter joints are in poor shape. The edges are glazed so the sand morter did not hold. I've used hydraulic cement to repoint them. I repaired all open joints...

Another basement bathroom addition: no rough-in [ 3 Answers ]

Hello, We are planning on finishing the basement of our 1942 house in Seattle. Currently, it has an unfinished cement floor, foundation walls, and exposed ceiling. We're planning on staining the floors, framing the exterior walls and adding a few interior walls, and drywalling the ceiling. ...

How to repair basement wall? [ 1 Answers ]

Hello, If I'm not in the correct category here, please direct me to the correct one. I have a split level house which has a partially submerged basement. The basement walls are approximately 4 feet deep into the ground. Every time it rains, water seeps in from 2 walls at the bottom where they...

Basement bathroom addition [ 1 Answers ]

I am a single mother with no working knowledge of how a project is done and the expected time of completion. I am worried about being taken advantage of since I know nothing of my project. I am adding a bathroom to a basement. The bathroom wall backs up to all the plumbing into the home. My real...


View more questions Search