BAsement Bath addition
[ 1 Answers ]
I plan to add a bath in my basement. However, there is not a rough in. The house's plumbing is connected to a septic system. The pipe going out to the septic is located about halfway up the basement wall. The plumbing from the upstairs is exposed, as the basement is not finished. However, I...
Leeking basement wall
[ 1 Answers ]
House was build in 1909. First four courses are glazed tile blocks above that there are cinder blocks. The tile blocks are hollow and the morter joints are in poor shape. The edges are glazed so the sand morter did not hold. I've used hydraulic cement to repoint them. I repaired all open joints...
Another basement bathroom addition: no rough-in
[ 3 Answers ]
Hello, We are planning on finishing the basement of our 1942 house in Seattle. Currently, it has an unfinished cement floor, foundation walls, and exposed ceiling. We're planning on staining the floors, framing the exterior walls and adding a few interior walls, and drywalling the ceiling. ...
How to repair basement wall?
[ 1 Answers ]
Hello, If I'm not in the correct category here, please direct me to the correct one. I have a split level house which has a partially submerged basement. The basement walls are approximately 4 feet deep into the ground. Every time it rains, water seeps in from 2 walls at the bottom where they...
Basement bathroom addition
[ 1 Answers ]
I am a single mother with no working knowledge of how a project is done and the expected time of completion. I am worried about being taken advantage of since I know nothing of my project. I am adding a bathroom to a basement. The bathroom wall backs up to all the plumbing into the home. My real... View more questions Search
|