Not your question?
Ask your question
View similar questions
Add your answer here.Check out some similar questions!
Reducing PVC from 4" to 3"
[ 3 Answers ]
This run goes from 4" cast iron to 3" PVC and back to 4" cast iron. Is it necessary to replace the 3" PVC with 4" PVC? If it is, please refer me to the code in the Plumber's code book that requires this. What type of hubs are code to use to replace this? What code book do plumbers use? ...
Connecting 1 1/2" ABS to 1 1/4" pipe
[ 4 Answers ]
Can I trust a flexible fitting to connect 1 1/2" ABS to existing 1 1/4" pipe, which is sold in the retail outlets for a closed wall bathroom drain? Do these flexible connectors with torque down clamps provide durable connections that will last without leaks?
PVC to Cast iron "Speed bump"
[ 1 Answers ]
Hello all, I call this thread the speed bump because when I dug out my basement floor to replace an upstream section of cast iron pipe with new pvc pipe for a bathroom and to move my stack, the downstream attachemtn to the cast iron pipe is now giving me some mild trouble. The cross section of...
Toilet , 4" pvc to 3" cast
[ 4 Answers ]
I have a home with a basement and problems with a toilet on the first floor. I had to repair the floor because the old cast flange was leaking. I cut out The flange and around 4 foot of old cast 3" pipe. I repaired the floor and used a 4" pvc flange and 4" pvc pipe with a 4"to3" rubber boot to...
Two parts: moving toilet over 4" and connecting to 4" black plastic to make shower
[ 3 Answers ]
Hi friends, I have a concrete slab foundation. In one full bath, I'm changing out the tub to put in a sauna tub, going from 60x30 to 60x32. The toilet is right next to the tub, so I want to move the toilet over at least 4" and change the sink to a pedastal sink to make room for the move for... View more questions Search
|