    Hi,
    I just finished chipping the cement away and cutting my stack down to the proper height to mount my flange, but unfortunately the 3" vertical stack is not level coming out of the cement floor.

    When I dry fit my flange it is lower on one side by about a 1/2".

    Any Idea on what my options are?

    I don't suppose the wax ring will make up that much of a difference would it?

    Thanks,
    Cam

    P.s this is a great site!!
    speedball1's Avatar
    speedball1 Posts: 29,301, Reputation: 1939
    Eternal Plumber
     
    #2

    Dec 9, 2007, 03:56 PM
    Sorry my friend but you're going to hafta bust out the cement and strighten up that pipe. I wish I could be more helpful with a miracle fix but I can't. Good luck, Tom
    CamG's Avatar
    CamG Posts: 3, Reputation: 1
    New Member
     
    #3

    Dec 9, 2007, 04:13 PM
    Thank you very much for the quick response.

    Would my best bet be to bust up the concrete, dig down to the elbow, try to bend the main stack straight, support it, and then back fill with gravel and cement ?

    I measured down the inside of the pipe and I have about 14" to the elbow. Do you think that is enough to be able to bend the stack ?

    Thanks again,
    Cam
    plumberjames83's Avatar
    plumberjames83 Posts: 99, Reputation: 5
    Junior Member
     
    #4

    Dec 9, 2007, 07:59 PM
    You might break something bust all the what though and cut and reglue your closet bend that's your best bet
    CamG's Avatar
    CamG Posts: 3, Reputation: 1
    New Member
     
    #5

    Dec 10, 2007, 08:41 AM
    Hi,
    Thanks for the help.
    I broke up a good amount of the floor and found the original problem

    The reason the vertical stack is not level is because the main horizontal pipe is on an angle. It is sloped down towards the main pipe that exits the house.

    So my new problem is, If I cut the horizontal pipe and put a new elbow on it, will I still be off level because of the original slope of this horizontal pipe ? I think something is going to have to bend somewhere...

    Thanks
    Cam
    ballengerb1's Avatar
    ballengerb1 Posts: 27,378, Reputation: 2280
    Home Repair & Remodeling Expert
     
    #6

    Dec 10, 2007, 08:51 AM
    You may need to make your cut at the main and replace the entire horizpntal pipe level. If you were to switch to an Oatey Twist-N-Set flange you might find that you can make up that 1/2" out of level, I'm not 100% sure but if it doesn't work you can retrun the part, about $18.

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Installing toilet over new hardwood floors - flange is now below floor level [ 2 Answers ]

I have remodeled a bathroom and replaced carpet floors with hardwood. This now puts the toilet flange below the floor level. Is there a thicker or additional flange to bring the connection (with the toilet) level up 1/2 to 3/4 inches?

Concrete slab:Toilet flange below floor level [ 4 Answers ]

I am Installing a hardwood floor on a concrete slab. In order for that type of installation I will need to build up the sub-floor with 1/4 plywood alone with 3/4 hardwood floor. I am installing this in the bathroom. The flange of for the toilet will be about an 1" below the floor level. How do I...

Toilet flange above floor level [ 56 Answers ]

I've seen plenty about the opposite problem - maybe this is something less common: my toilet flange is above the anticipated floor level. I recently removed old tile from the bathroom floor, planning to install new tile. In so doing, I discovered that the old tile was set on about 3 inches of...

How do you install an acrylic shower receptor using "setting bed" cement? [ 3 Answers ]

How do you install an acrylic showwer receptor using "setting bed" cement? The sub floor is good and the hole for the drain is 5" as recommended. How do you actually form the setting bed so the receptor is level? 48" x 34" and that's all the space I have to work with.

Toilet flange below the floor level- URGENT [ 3 Answers ]

Hi Guys, I just quickly reviewed all postings here trying to see if I can find an anwer to my question, but some things are too difficult for me to understand, as I am not familiar with the whole subject. I hired a plumber to install a new toilet in half a bath in the basement. The old toilet...


View more questions Search