    Hi,

    I am just getting ready to frame the basement for a bathroom and have a few questions. We just recently had our house built and had 2 rough in's put into the basement that empty into a pit that has a grinder pump attached to it. Nothing is currently using the grinder pump, the first bathroom I am working on now down there will be the first to use it.

    There are 3 pipes for each rough in. A 4 inch for the toilet and two 1 1/2 inch pipes for the sink and tub. My question is on the tub. Currently there is an opening about 6x6 that has a 1 1/2 inch pipe sticking up out of the floor about 2 feet with a cap on it. There is gravel packed all around the pipe in the hole, do I need to cut the pipe down and install the trap or would our builder have already put the trap in there and ran the 1 1/2 inch pipe up out of it?

    Then I have an issue with the framing, the issue is that we would like to install a tub in the basement, however, the rough-in is 18 inches from the rear wall, before framing, and 57 inches from the left wall before framing. The problem is that a standard tub won't fit unless I raise the floor. I'm thinking about raising the floor about 3.5 inches, cutting the pipe off where it comes up out of the DAP out and then putting a 90 degree elbow on the pipe to bring it to the right as far as I need it to be. Is there anything I need to be concerned about in doing this?

    Thanks,

    John
    speedball1's Avatar
    speedball1 Posts: 29,301, Reputation: 1939
    Eternal Plumber
     
    #2

    Jan 3, 2006, 11:26 AM
    Hi John,

    "There are 3 pipes for each rough in. A 4 inch for the toliet and two 1 1/2 inch pipes for the sink and tub."

    Your holding tank has to have a dedicated roof vent to operate. I see no mention of it here.

    " Currently there is an opening about 6x6 that has a 1 1/2 inch pipe sticking up out of the floor about 2 feet with a cap on it. There is gravel packed all around the pipe in the hole, do I need to cut the pipe down and install the trap or would our builder have already put the trap in there and ran the 1 1/2 inch pipe up out of it?"

    If there's a raiser sticking up out of the gravel then the trap's already installed. This is a tub dap out.

    " I have an issue with the framing, the issue is that we would like to install a tub in the basement, however, the rough-in is 18 inches from the rear wall, before framing, and 57 inches from the left wall before framing. The problem is that a standard tub won't fit unless I raise the floor. I'm thinking about raising the floor about 3.5 inches, cutting the pipe off where it comes up out of the DAP out and then putting a 90 degree elbow on the pipe to bring it to the right as far as I need it to be. Is there anything I need to be concerned about in doing this?"

    Yes! A whole bunch of drainage problems from that "S" trap you just installed.
    Your plumber left you with a problem. For a regular sized tub,( 31" X 60") he left you with a 14 1/2 " rough for a 15 1/2" one and 53 1/2" when he should have left you 60".
    Your solution is to platform the tub, build a "S" trap and hope for the best.
    Let me give you a more workable solution. Dig out the dap out and cut the trap off the drain line and reposition the trap to pick the tub up.
    I hate to use the phase "Mickey Mouse" but that's what platformed tubs with a exposed drain line leading over to the trap looks like.
    My advice? Move the trap and make your job look like a professional did it even if your plumber couldn't. Good luck, Tom
    johnkemmerer's Avatar
    johnkemmerer Posts: 3, Reputation: 1
    New Member
     
    #3

    Jan 3, 2006, 12:11 PM
    Hi Tom,

    Thanks for you reply. If I remove the trap from the Dap out, I assume that the pipe on the other end is 2 inchs, but it might be 1 1/2 as well. Either way, would bringing the 2 pipe about 4 inches out of the concrete after the trap is removed, adding a 90 degree elbow to the right, then adding the p-trap back right below the drain from the tub be OK? I was wrong on the back wall, they did leave enough room for the required 15 1/2 inches. But I will need to come over at least 7 inches to the right under the raised floor to fit the tub in. As for the venting, I believe that is taken care of, there is a vent coming off the sink drain running up through the attic to the roof. All three pipes are connected together.

    Thanks,

    John
    speedball1's Avatar
    speedball1 Posts: 29,301, Reputation: 1939
    Eternal Plumber
     
    #4

    Jan 3, 2006, 12:43 PM
    John, Read my last post in which I said, ""Your holding tank has to have a dedicated roof vent to operate. I see no mention of it here."
    And then you tell me, "As for the venting, I belive that is taken care of, there is a vent coming off the sink drain running up thru the attic to the roof. All three pipes are connected together."

    John, a dedicated vent means just that. A vent from the holding tank through the roof with no tie ins or connections. If there is a holding tank vent that's connected to another vent then the job will be red tagged at inspection. The reason for this is while the drainage vents only breathes in a holding tank vent breathes both in and out. If you tie the holding tank vent back to the drainage vents you will be injecting sewer gas back into a vent system that's designed to remove it. Hence, a dedicated vent.

    "would bringing the 2 pipe about 4 inches out of the concrete after the trap is removed, adding a 90 degree elbow to the right, then adding the p-trap back right below the drain from the tub be ok?"

    You're just bound and determined to platform that tub and build yourself a "S" trap aren't you? Both ways that you suggest are oultawed.
    What's wrong with breaking up cement and moving the trap? Sounds like a win-win situation to me. Your tub will set of the floor with the drainage concealed and not look like a afterthought. Is there a problem I don'r know about? Regards, Tom
    johnkemmerer's Avatar
    johnkemmerer Posts: 3, Reputation: 1
    New Member
     
    #5

    Jan 3, 2006, 01:38 PM
    Hi Tom,

    There is a pit where the grinder pump sits in, I assume this is what you mean by the holding tank, there is a direct vent from there up through the attic as well, and another vent on the drain line from the sink. As for the tub, I was hoping to find a solution to install a tub without having to break up the concrete, but that looks like it will take allot more work than I had originally tought. I might just look at putting a stand up shower in now instead. Thanks for all your help.

    John
    speedball1's Avatar
    speedball1 Posts: 29,301, Reputation: 1939
    Eternal Plumber
     
    #6

    Jan 3, 2006, 03:48 PM
    Hi John,

    "There is a pit where the grinder pump sits in, I assume this is what you mean by the holding tank, there is a direct vent from there up thru the attic as well, and another vent on the the drain line from the sink."

    I hope you mean closed tank instead of open pit. A pit would mean that you have a open cesspool in your basement. You'll have to parden mr for picking your statements apart but I take things literally. To me "pit" means open while tank means closed. If you plan on a plastic or fiberglass shower base make sure it's bedded in properly. Good luck, Tom

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Install win xp pro from hdd [ 7 Answers ]

How to install WIN XP PRO from HDD?

Basement Shower Install [ 4 Answers ]

I have a basement with a rough-in for a 1/2 bath but would like to add a shower. If I use a preform shower can I elevate it so as to put in a trap? Do I even need a trap? If I do need a trap how much space is needed from drain to trap and trap to main line? Also can I utilize the drain pipe for...

Basement Shower Install [ 1 Answers ]

Hello, I'm installing a bathroom in my basement. It was originally roughed in for a toilet and sink, of course, we want a shower as well. The shower will go close to where an existing floor drain was, so I dug up the floor and took out the old floor drain trap, y'd the line and put in a new...

Trying to install bathroom in basement [ 1 Answers ]

I am a rookie or novice person. I am good with instructions. I have an unfinished basement. In the basement, I have a full bath rough-in. I am looking for a good book to use as a guide on how to finish my bathroom. I am thinking of adding a full bath in the basement. I need guidance in what...


View more questions Search