Hi,
I am just getting ready to frame the basement for a bathroom and have a few questions. We just recently had our house built and had 2 rough in's put into the basement that empty into a pit that has a grinder pump attached to it. Nothing is currently using the grinder pump, the first bathroom I am working on now down there will be the first to use it.
There are 3 pipes for each rough in. A 4 inch for the toilet and two 1 1/2 inch pipes for the sink and tub. My question is on the tub. Currently there is an opening about 6x6 that has a 1 1/2 inch pipe sticking up out of the floor about 2 feet with a cap on it. There is gravel packed all around the pipe in the hole, do I need to cut the pipe down and install the trap or would our builder have already put the trap in there and ran the 1 1/2 inch pipe up out of it?
Then I have an issue with the framing, the issue is that we would like to install a tub in the basement, however, the rough-in is 18 inches from the rear wall, before framing, and 57 inches from the left wall before framing. The problem is that a standard tub won't fit unless I raise the floor. I'm thinking about raising the floor about 3.5 inches, cutting the pipe off where it comes up out of the DAP out and then putting a 90 degree elbow on the pipe to bring it to the right as far as I need it to be. Is there anything I need to be concerned about in doing this?
Thanks,
John