Not your question?
Ask your question
View similar questions
Add your answer here.Check out some similar questions!
Adding control joints in 6 month old concrete?
[ 2 Answers ]
My concete floor in my shed is about 6 months old. It was made in two pours of 28'x30', 6 inches deep with wire panels. No control joints were sawn in at the time. Can I still saw them now and will they still work to guide any cracks that may occur. So far no visible cracks but I am in Illinois...
Can you reliably pour a new concrete driveway over an old concrete driveway?
[ 2 Answers ]
The city came through a neighborhood that I have a rental on and elevated the road about 10 inches and installed new city sidewalks also 10 inches higher and poured a cheap asphalt ramp to the older cracked but functional driveway. In my mind I want to rip out the asphalt ramp, place some forms,...
Concrete driveway falling apart. Is there something that can be poured over concrete
[ 2 Answers ]
My drive way is about 25 years old, Its breaking up into rocks that were used in the mix. I have large pot holes. I don't have the money to break up and replace at this time. Is there any thing on the market that I can put on top of it.
Concrete cold joints
[ 1 Answers ]
The method of rectify concrete cold joints
Resurface concrete driveway
[ 2 Answers ]
Has anyone used quikrete concrete driveway resurfacer,what kind of results did you have.Thanks View more questions Search
|