Control Joints in concrete driveway
	
	
		I had a new concrete driveway installed in July. It's 6 inches thick with wire mesh in it. It's a large driveway that was poured from 8:00 am to 2:00 pm. It was cut the next morning around 8:00 am. The contractor used a soft-cut saw and cut the control joints 1 inch deep. The panels are about 7.5' x 7.5'. Are the saw cuts deep enough?  Everything I'm reading says that an early entry saw has to be used within about 4 hours of finishing to be effective, otherwise you must cut the joints 1/4 to 1/3 the thickness of the slab. If the cuts aren't deep enough, can the joints be cut deeper?  If so, is there benefit to doing so?  Any advice is much appreciated!