Okay after 7 years in my house I am finally re-doing my basement. It was finished but the previous owner didn't think the project out very well and he cut a lot of corners. It's taken me several months but I have completely removed everything he did.
I assumed the plumbing was roughed in but when I gutted the bathroom I found out that he jackhammered the floor and ran the plumbing himself. Anyway under the shower there was a huge hole in the slab (DAP OUT?? ), the vents ended in the wall with some sort of spring type vent, and the overall placement of the drains is not really condusive to how I want to redo the area. (BTW should the dap out be filled with gravel or something? should I leave it?)
What I am going to do is rent a jackhammer, remove what he did and complete the job correctly. I haven't removed the floor as of yet but it appears that he tied the tub/shower, toilet, sink, and wet bar sink into the floor drain in the utility room. Is this acceptable? I have not had any problems other then the wet bar sink draining slow (I have now removed the entire bar so this problem is gone).
I have a wall in the room above so I will be able to vent the new fixtures through the roof. I assume this is better then the current spring type in wall vents?
I planned on venting the sink directly up through the roof and making a loop vent for the shower that ties into the sink vent. I assume the toilet does not require a vent. Is this correct?
Anything else I should look out for?
I want to do it all myself and then have a plumber look at it before I fix the slab.
|
|
 |
Eternal Plumber
|
|
Aug 10, 2005, 03:53 PM
|
|
 Originally Posted by Garyt
Okay after 7 years in my house I am finally re-doing my basement. It was finished but the previous owner didn't think the project out very well and he cut a lot of corners. It's taken me several months but I have completly removed everything he did.
I assumed the plumbing was roughed in but when I gutted the bathroom I found out that he jackhammered the floor and ran the plumbing himself. Anyway under the shower there was a huge hole in the slab (DAP OUT????), the vents ended in the wall with some sort of spring type vent, and the overall placement of the drains is not really condusive to how I want to redo the area. (BTW should the dap out be filled with gravel or something?, should I leave it?)
What I am going to do is rent a jackhammer, remove what he did and complete the job correctly. I haven't removed the floor as of yet but it appears that he tied the tub/shower, toliet, sink, and wet bar sink into the floor drain in the utility room. Is this acceptable? I have not had any problems other then the wet bar sink draining slow (I have now removed the entire bar so this problem is gone).
I have a wall in the room above so I will be able to vent the new fixtures through the roof. I assume this is better then the current spring type in wall vents?
I planned on venting the sink directly up through the roof and making a loop vent for the shower that ties into the sink vent. I assume the toliet does not require a vent. Is this correct?
Anything eles I should look out for?
I want to do it all myself and then have a plumber look at it before I fix the slab.
Hi Gary,
I could help you better if you would tell me what fixtures you plan on installing and in what order. Toilet , lavatory, shower or tub? And bar sink? The original rough in was roughed for a bath tub, (the dap out) but instead had a shower installed over it. You shouldn't have to vent the shower if you connect to the lavatory drain and let the lavatory wet vent it. Running the vent out to the roof is always better then mechanical vents. Please give me the details of what you're planning to unstall and I'll get back to you.
Regards, Tom
|
|
 |
New Member
|
|
Aug 10, 2005, 05:27 PM
|
|
Sorry I guess my questions were a little confusing.
The wet bar is gone but I am going to bust up the floor to remove the plumbing under the slab.
The layout will be shower, toilet, tie into the floor drain and then the sink. That's why I thought I would need to have a vent off the shower and loop to the sink that will then vent to the roof.
|
|
 |
Eternal Plumber
|
|
Aug 11, 2005, 07:22 AM
|
|
 Originally Posted by Garyt
Sorry I guess my questions were a little confusing.
The wet bar is gone but I am going to bust up the floor to remove the plumbing under the slab.
The layout will be shower, toilet, tie into the floor drain and then the sink. That's why I thought I would need to have a vent off the shower and loop to the sink that will then vent to the roof.
Hi Gary,
If you were to tie the shower drain into the lavatory drain the shower would be wet vented and you wouldn't have to revent it. If that's not possible then go with the revent. Good luck, Tom
|
|
 |
New Member
|
|
Aug 11, 2005, 07:52 AM
|
|
Thanks Tom,
I really appreciate all the time you spend on this board answering the hundreds of questions that you do.
It's great to have the ear of an expert.
|
|
Question Tools |
Search this Question |
|
|
Add your answer here.
Check out some similar questions!
Replacing basement shower with bathtub..
[ 13 Answers ]
Hi guys.
So, I need to replace a basement shower with a bathtub. I replaced tubs before, not that hard.
However, I've never quite done this, and I'm concerned about the drain. Obviously, I'd like to move it a bit, maybe a foot or so. How hard is it to adapt what's there to a bathtub drain.
...
Replacing a bathroom vanity light
[ 2 Answers ]
I am replacing a bathroom vanity light and would like the replacement to also have an electrical outlet since there is none in this 1960ish bathroom.
Do they make these anymore?
If not, in what other way could I get both a light and an electrical outlet in the bathroom?
Thanks
Replacing neo angle shower pan basement
[ 1 Answers ]
Greetings... I want to replace my neo angle shower walls and floor pan. I have no problem with the door, walls or working around the shower valve but I am stumped as to how to remove the shower pan and drain from the drain line pipe. Its all relatively new plumbing (6 yrs... plastic piping). What...
Replacing bathroom faucet
[ 1 Answers ]
I replaced my bathroom faucet but can't get the water supply line to stop leaking on the hot water side. It's a copper pipe and the cold water side hooked back up with no problems. Please help.
Basement bathroom
[ 3 Answers ]
Okay, it's late but will try to fill in all the details to get a proper answer.
My father in law has installed his own bathroom in the basement of his 2 year old bunglow. We tied into the existing 4" PVC drain below concrete to install sink, shower and toilet. above this addition is master...