Ask Experts Questions for FREE Help !
Ask
    bullscricker's Avatar
    bullscricker Posts: 2, Reputation: 1
    New Member
     
    #1

    Nov 10, 2009, 05:03 PM
    How do I convert a hotels boiler copper pipes to pvc?
    The copper pipes at the hotel in which I work have been springing leaking fairly frequently and the owner has decided if possible to convert the copper pipes to pvc pipes. But not throughout the entire hotel, only the main piping coming out of the boiler. First of all, is this even possible and second, how would I do it?
    Joshdta's Avatar
    Joshdta Posts: 2,549, Reputation: 45
    Ultra Member
     
    #2

    Nov 10, 2009, 05:06 PM

    WHat size pipes are we talking?
    bullscricker's Avatar
    bullscricker Posts: 2, Reputation: 1
    New Member
     
    #3

    Nov 10, 2009, 05:10 PM

    2 inch and bigger, probably up to around 3 inches.
    KC13's Avatar
    KC13 Posts: 2,556, Reputation: 99
    Ultra Member
     
    #4

    Nov 10, 2009, 06:25 PM
    This is a bad idea... on so many levels. PVC isn't rated for the temperature of the application. Check the grade of the copper present. Look into conditioning the water in the system. There is a reason it hasn't been done already... at least I hope it hasn't.

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Whole house cold water pressure drop off,public water pvc pipes [ 2 Answers ]

Hi! I searched the forums and didn't find my exact problem. So at every faucet in the house, the cold water drops off after initial turn on. House is on the public water main and was plumbed with PVC pipe. Just turned 5 yrs old I am guessing I have some kind of obstruction? There is a main...

Replacing Iron 2" Boiler Pipes with 3/4" Copper [ 1 Answers ]

I am remodeling my basement and want to replace my old head-height radiator system pipes with copper pipes that I can run between the joists and out of the way. The system is an old gravity system, but now has a new-ish boiler with a pump. The return pipes into the boiler are converted to 3/4"...

Convert half of the kitchen and boiler room into a shower and toilet [ 2 Answers ]

I need to convert half of the kitchen and boiler room into a shower and toilet,how can I and how much will it cost

PVC to Copper Pipes? [ 3 Answers ]

Hi, I just purchased a newly constructed condo, and it is a construction mess. One of the problems is that the whirlpool tub leaks heavy. The building is sittuated above a subterrainian gargae and the plumbing is visible in the ceiling of the garage. I am able to see the water from my tub,...

Copper pipes to cpvc: still ground the old copper? [ 1 Answers ]

Hi there... again... I have two copper stub outs that come into my garage, one the cold water in, which goes to my waterheater, and one hot water out, to the rest of the house, underground (slab construction). I will be re-plumbing my water heater and adding a bathroom from these lines, but I...


View more questions Search