Ask Experts Questions for FREE Help !
Ask
    PSU FAN's Avatar
    PSU FAN Posts: 3, Reputation: 1
    New Member
     
    #1

    Sep 24, 2009, 07:42 AM
    System of Linear Equations: Matrices
    I am having trouble figuring out the equations for this problem. I think that I am reading too much into it.

    As a business owner there are many decisions that you need to make on a daily basis, such as ensuring you reach the highest production levels possible with your company’s products. Your company produces two models of bicycles: Model A and Model B. Model A takes 2 hours to assemble, where Model B takes 3 hours to assemble. Model A costs $25 to make per bike where Model B costs $30 to make per bike. If your company has a total of 34 hours and $350 available per day for these two models, how many of each model can be made in a day?

    * Solve the equations for the different bicycle models that can be made daily with the desired technique learned (graphing, substitution, elimination, matrix).
    * Explain how to check your solution for both equations.
    ArcSine's Avatar
    ArcSine Posts: 969, Reputation: 106
    Senior Member
     
    #2

    Sep 24, 2009, 08:44 AM
    The problem gives you two "constraints" that the manufacturer must stay within. Letting A and B denote the number of A models and B models produced each day, respectively,

    ... the first constraint is that no more than 34 hours can be expended on production:



    ... the second limitation is that the total dollars expended must be no more than $350:



    Graph both of these linear inequalities, with the horizontal axis representing either A or B, and the vertical axis for the other. Since both conditions must be satisfied, your shading of the "feasibility range" will be that area that lies beneath both lines at all times.

    The maximum feasible daily production will be the various combinations of As and Bs that represent the upper boundary of your shaded area. Also remember to limit your attention to Quad I of your graph, as Quads II - IV represent negative production quantities, and so should be disregarded.

    Hope that helped out a bit.

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search


Check out some similar questions!

Systems of Linear Equations: Matrices [ 2 Answers ]

I am having trouble setting up the equations for this problem. I think that I am reading too much into it. Any help would be great. Thank you in advance. As a business owner there are many decisions that you need to make on a daily basis, such as ensuring you reach the highest production...

System of linear equations in 3 variables [ 4 Answers ]

This question bugs me. I don't know how to get started. The teacher gave us a chart. We have to do 3 things. 1. define 3 variables 2.write system of linear equations in 3 variables relating to known quantities and variables. 3.solve for the variables the chart was for dress shirts,dress...

How can I solve a non-linear system of two equations, two unknowns? [ 1 Answers ]

I need to find the critical points and relative max/min for this equation: f(x,y)=x^2+y^2+(1/x^2*y^2) I found the partials with respect to x and y. I equal them to zero in order to find the critical points, and got the equation: y^4*x^2=y^2*x^4 My question is how can I solve this...

Linear equations [ 1 Answers ]

I need some help for this equation need to combine like terms .then solve and simplify x+6=2x+5 :)

Solving simeltaneous equations using matrices [ 4 Answers ]

How can you solve a pair of equations with 2 variables if you've been given a matrix with the variables? Like suppose you're given (4 -1 ) (-3 2 ) and the two equations given are y = 4x + 8 2y -3x + 1 = 0


View more questions Search