1 Attachment(s)
Basement bathroom plumbing/venting help needed
I am currently working on expanding my basement bathroom to include a shower, and I'm trying to do most of the work myself. My existing bathroom had a toilet connecting to a 4 inch main under the concrete, and a vanity, which connected to a drain coming down from the 2nd floor from the kitchen sink.
Now I am adding the shower, and the fixtures will be located in the following order from left to right (see pic): shower, toilet, vanity, main waste line.
I can run the vanity the same way as the old setup (attaching to the kitchen drains) or I can include it with the shower and toilet in the basement underground plumbing.
Do you guys have any recommendations on how I should proceed? I am especially concerned about venting.