What is the full assebly of conduit parts a connector use in a 100amp serviice
What is the full assembly of non matalic conduit parts and connectors use in a 100amp service from a main house 200 amp service box to a annx building sub-box with approved underground wire run including,a separate approved underground 240 4 cable for electric (oven/range 240) neither requier conduit, concerned with wall structure go through points question if entrence service wires can be piped up though floor of new structure and allow for inspections by code officer and electrician sign off.