Comment on parttime's post
Thanks for the response. I am new to this and learning. The concrete slabs are separate and I was going to tie them together and allow for expansion with out cracks. I found that you could drill one side and put rebar and then pour other slab. I think that allows the slab to contract with out moving. I was wondering if I could put the dowels in before I poured.
I am not even sure this is needed. Is just using the rebar for expansion joint sufficient for decreasing cracks. I am probably over thinking this.