Hello,
Im starting to finish my basement and have a few questions on the stubbed in plumbing.
It is stubbed for a full bath and drains into an ejector pump. I marked on the photos below what I thought each pipe is for, but there is one unknown 2" pipe next to the toilet. Also, on the other side of the room is another drain for a bar, but no vent pipe.
My questions are; what is the unknown pipe next to the toilet for? How do I vent the toilet and shower (wet vent?) What's the best way to vent the bar sink? Thanks for any input.
http://bergsonline.com/P1.jpg http://bergsonline.com/P2.jpg
http://bergsonline.com/P3.jpg http://bergsonline.com/P4.jpg
http://bergsonline.com/P5.jpg http://bergsonline.com/P6.jpg