Existing knife shut-off and meter are on pole 20 feet away and has been double tapped to service 2 different panels inside. I need to hang a new 200A panel on outside and tie the furthest panel in as a sub panel. What size wire, what type of wire and what conduit will work? For instance, can I use a 1 1/2" pvc conduit from the knife shut-off with a shield or just all galvanized?
