I am installing a shower in a basement bath. The bathroom was roughed in for a tub with a 1 1/2" drain, but when the concrete slab was poured, they filled the tub drain box with concrete so I am left with a solid block of concrete where that drain was to be.
I am installing a fiberglass shower stall 24" to the left of that unusable tub rough in, using 2" PVC. The toilet is locate 48" from this new shower drain, and the toilet is vented through a 2" dry vent.
I intend to tie the shower drain into this toilet vent line. I will use a wye fitting and slope the drain at 1" over the 48".
Is it a problem venting this way?
Thanks

