When I had my house built, I had the contractor rough in plumbing for a basement bathroom. I have a bi-level house so when I was going to install the toilet I noticed that there was a pipe hanging out of the basement ceiling above where the toilet is going. Since the piping was already installed and under the concrete floor does this mean I am going to have to dig the floor up to connect the vent to the toilet drain or is there another vent hooked up some where else on the drain line