I am going to be cutting into a 4" stack pipe to add a 2" T that feeds a new shower/sink. About a foot above where that T will go is where the toilet line meets the stack. Do I need to support the vertical stack with a riser clamp or can I just support the horizontal line from the toilet with a long 2x4?