Planning some remodeling. Main breaker panel, currently within five feet of the meter, may be moved approximately 12 feet due to the size of the panel and framing considerations. A listed service disconnect will be placed at the old panel location, and rigid used from meter to disconnect. Question is, what type of conduit is permissible/acceptable FROM the disconnect TO the panel, rigid or EMT? Thanks