I currently have a tub/shower combo with a liner (must be 25+ years old). I'm going to rip everything out and install tile, new shower and tub faucet and new rough in valve. I'm just looking for some expert advice or tips on how I should go about doing everything. I figure do my due diligence now instead of when I'm knee deep in the project. I plan on removing all the old drywall and putting up hardibacker, good/bad idea? Can the hardibacker go right on studs then tiles on that? Or do I need green board behind it?
Current conditions:
Vinyl liner
3 knob faucet control
Sliding glass door
New:
Ceramic tile (12"x12") up to ceiling
Single know faucet control
Sliding glass door
Any thoughts or tips are greatly appreciated.