Basement Rough In-- Vince
Ok, here's the skinny, I tried to save $$ by hiring a handyman plumber, but things just don't look right. In the basement the install would be wetbar, shower, toilet, and lavatory in that order. I'm attaching a picture of what has been done so far, I will accept all complaints because I need to get this done. I've done some reading and that's how I've come to the conclusion that things are not right. I tried to upload the picture but it is to large 388kb is there a way that I can compress it down to 279kb I've tried everything. Well, I will try to explain what I have there is one 2 inch pvc pipe (wetbar sink) that is approximately 26 inches from the exterior wall. It is 12 inches in height. That's picture im00606 first stub is wet bar second stub is shower. The second pis the one I tried to edit. The third picture is showing the toilet and lavatory to the right. The stubs that are shown are drains that are connected under the concrete. I don't see any venting for these pipes. It's been about six months since this work was done. I'm just trying to get this thing done one way or another any input at all would be greatly appreciated.
Thanks,
vince