    The load data given in table 1 belongs to a power company. Develop
    The load data given in Table 1 belongs to a power company. Develop the daily load curve for the primary feeder. Also, determine:

    a. maximum coincident demand of the system
    b. demand factor if the feeders total connected load is 4MW
    c. utilisation factor, if the feeders rated capacity is 5MW
    d. load factor
    e. diversity factor
    f. coincidence factor
    g. load diversity
    h. loss factor

    Table 1: Daily load curve data
    Time Load(kW)
    Residential Commercial Lights
    00:00 250 300 100
    01:00 250 300 100
    02:00 250 300 100
    03:00 250 300 100
    04:00 250 300 100
    05:00 250 300 100
    06:00 250 300 100
    07:00 350 300
    08:00 450 400
    09:00 550 600
    10:00 550 1100
    11:00 550 1100
    12:00 600 1100
    13:00 600 1100
    14:00 600 1300
    15:00 600 1300
    16:00 600 1300
    17:00 650 1300
    18:00 750 900
    19:00 900 500
    20:00 1100 500 100
    21:00 1100 500 100
    22:00 900 300 100
    23:00 700 300 100
    24:00 250 300 100
    donf's Avatar
    donf Posts: 5,679, Reputation: 582
    Printers & Electronics Expert
     
    #2

    Feb 14, 2013, 07:11 AM
    That is a truly nasty homework question, good luck!

    We do not answer homework questions. What we will do is review your answers after you have done the work.

    Also, you have not included the databbase application so you are asking us to engineering level work, by hand on a residential DIY forum.
    ma0641's Avatar
    ma0641 Posts: 15,675, Reputation: 1012
    Uber Member
     
    #3

    Feb 14, 2013, 07:45 AM
    With the time it took to load this you could have it well along. What did you learn in school about this? BTW this is not easy. even for an experienced engineer
    hfcarson's Avatar
    hfcarson Posts: 1,003, Reputation: 49
    Ultra Member
     
    #4

    Feb 14, 2013, 08:26 AM
    ... and what will you do when the Professor wants to see your work?

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Change imported excel data from table structure to plain data [ 2 Answers ]

Hello, I have an excel spreadsheet that contains some imported tables. The tables contain close to 1 million records each. The tables come from an Access query that I import using Data --> Get External Data --> From Access. The problem is, the import sets the data up as an excel table which...

Collect data into 2 combo boxes from data in an access table [ 1 Answers ]

I have two combo boxes. When the form loads the db connection opens a recordset that selects all the data from the retaillocations table. When you choose the region (0-4), that number loads into a text box and the Contacts load into the forst combo box. Now I want to select only the Name based on...

Energy, power latent heat - data analysis - power storage systems [ 33 Answers ]

1. One possible design for a storage power station is to use off-peak energy to compress air into a sealed underground canve and then, during periods of high demand, to reverse the system so that the air can drive a generator. one system of this type compresses air from the atmospheric pressure...


View more questions Search