    I am adding a new bathroom in the basement. Is there a special order that toilet, lav. And shower should follow left to right 1 2 3, the left being the last fixture to the street ? What are the proper sizes I should be using to tie into 4" main with these 3 units? Can I tie and vent shower to lav, and all to toilet? 3 into 1, or should I tie into the main with 3 separate Y's ? Looking through the clean out, the main appears to be about 18 inches from top of concrete. Toilet, lav. and shower would be 3-5 ft. from main. How fast should all this fall to the main? I am sorry with all the questions,this is all very confusing.
    Thank you... Rick
    nick_mathew's Avatar
    nick_mathew Posts: 17, Reputation: 1
    New Member
     
    #2

    Feb 9, 2007, 11:24 PM
    if I'm going to design it, I would be using a 4" main all the wall to the water closet in a wye pattern where the end must be a floor clean out wyed to a 4"x2" for venting. before it goes to the water closet il install a 4" x 3" Y-branch and connect a 3" x 2" Y-branch each for lavatory and shower. The end of this branch would be a vent branch, where it is connected to pipe up from the lavatory and shower vent. Don't forget a floor drain near the water closet and importantly the p-traps. There would be no particular order as you have said, it is the convenience of design that governs, the pipings will just find its way, as efficient as possible(there are many ways to kill a cat). A 1% to 2% would be best for your slope. I'm a designer and not consider myself an expert. I cannot advice you man, some experts here are angry if somebody advices anybody else besides them. I hope you understand. I'm only telling what I would do, if I'm in your shoes. (in case they will read this).have a nice day. Happy renovating.
    speedball1's Avatar
    speedball1 Posts: 29,301, Reputation: 1939
    Eternal Plumber
     
    #3

    Feb 10, 2007, 03:01 PM
    " I'm a designer and not consider myself an expert. I cannot advice you man, some experts here are angry if somebody advices anybody else besides them."

    No Nick! Some experts around here get angry if they have to step in and keep correcting the bad advice that you post. So far I've had to correct you three or four times. And if you get pissy with me one more time you're out of here. As you say you're not a plumber and youi've proved that point to my satifaction with some of the advice that you've posted. If anyone doubts me just go back and read some of Nicks advice. Ya did pretty good here Nick, a little wordy but all in all pretty good. Much better then your other posts.

    Rick, Let me show you a typical basement bathroom group rough in. This configuation only uses one vent for the entire group.
    4" from the toilet to the main. The lavatory to connect to the toilet drain line with 2" and vent to the roof or revent back in the attic to a existing roof vent. The tub/shower to connect to the lavatory drain line with 2" and be wet vented by it as will the toilet. Make your slope 1/4" of fall to each foot of drain line. Be advised to always check local codes before changing or remodeling your drainage system. If you need more details click on back. Good luck, and Nick , I'll tell you this one more time. It can cost the askers big bucks if they follow bad advice on the technical pages such as, plumbing, AC, electrical, etc. I'm not out to bust yo chops. I'm trying to protect the askers. You start giving better advice and I'll get off yo back. Be aware that I'm not the only one that's looking at your posts. I'm just the most vocal. Cheers and get away from that keyboard and out in the fresh air. Tom

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Hissing noise in main plumbing in house [ 8 Answers ]

In the last few weeks I have noticed a steady increase in a hissing type noise coming from the pluming in my house.. from the same area where we have a water pressure control. My Neighbors recently experienced a water mains break right where it separates from the city pipes to the ones going to our...

Basement sink, sewer main tie-in [ 3 Answers ]

I am thinking about installing a basement wet bar w/ sink. There is a main sewer line coming from upstairs, going straight into the cement (has a cleanout about 2.5 ft above floor). The location I am looking to install the sink will be roughly 36 ft from this main swere line, with two 90 degree...

Can I tie into Kitchen drain from basement [ 3 Answers ]

Hi, I plan on putting a wet bar in my basement and want to know if I would be able to tie the bar sink drain into the kitchen drain coming from above? The kitchen drain looks like 2" PVC coming from upstairs and joins to a 3" pipe in the basement which goes directly into the concrete. From the...

How do I tie into main vent stack? [ 3 Answers ]

Are there any tricks to put a 3" Tee into the main vent stack to add a lavatory? I don't think I can lift the top part of the stack up or push the bottom part of the stack down once I cut it in half but I think I'll need to seperate it by something like 2" and then push it back together to have...

How do I tie into main vent stack (cont'd) [ 3 Answers ]

Ok, I'm all new to this forum; my apologies for not giving you enough information! The soil stack (didn't know the difference between a soil stack and a vent stack until you explained it) is a vertical 3" PVC pipe and I'm trying to tie a 1 1/2" PVC pipe into that for the lav by using a 3" x 1 1/2"...


View more questions Search