    How do you calculate the maximum load created by devices on a main service panel?
    200 amp panel is full, I need to add more equipment. When do I reach a point where I need to increase the size of the panel?
    ma0641's Avatar
    ma0641 Posts: 15,675, Reputation: 1012
    Uber Member
     
    #2

    Oct 20, 2010, 02:40 PM
    A lot depends on what load you are currently running and what you want to add. If you are loaded with high amperage breakers already, you should consider a higher amperage box. If, on the other hand, you are running a lot of 15 and 20 amp breakers, and plan on using similar loads, you can probably get by, swapping out the 1" breakers and installing 1/2 " breakers or installing a sub panel. You need to do a load determination to be safe. NEC 220 is where you need to go or get a qualified electrician to help you.
    ballengerb1's Avatar
    ballengerb1 Posts: 27,378, Reputation: 2280
    Home Repair & Remodeling Expert
     
    #3

    Oct 20, 2010, 03:44 PM

    Just because a panel is full doesn't mean you can not add more receptacles. You have to determine the draw on your current circuits and then also consider would you ever run say a welder at the very same time you would be running some other equipment on the same circuit. In an extreme example you could put 20 electric arc welders on the same circuit to the same breaker, YOU JUST COULD NOT USE THEM ALL AT ONCE. I have yo agree with ma0641 about getting or doing a load determination by an electrician.

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

How can I calculate maximum demand load from connected load in KW [ 3 Answers ]

Hi I am ssaha, I want to ask, how can I calculate maximum demand load from connected load? Suppose in a shopping complex cannected load is 5000 KW. Only connected load is known but other component like demand factor not specified. In that case how can I calculate maximum demand load? Please help me.

Sub panel load size from main panel 200 amp to 100sub 350 ft [ 1 Answers ]

Wire conduit size fromm a main 200 amp panel to a 100 amp sub panel 350 ft away

How do you calculate maximum load? [ 0 Answers ]

Suppose a machine that moves a load at 3 ft/s has a maximum power rating of 50 hp. What is the maximum load/

Main Service Panel needs [ 9 Answers ]

I ran across this site accidentally today and found someone who had many of the same issues I need help with. Most of my questions were answered reading the forum however I have one more, using the following information I am hoping someone can help. The existing house is apx. 2300 sq ft w/a 200...


View more questions Search