    Civil engineering
    I'm putting in a new manhole I have a datum of 38.085 invert level 36.320 and the cover level is 37.485 what would be the depth to dig the hole and the method of working it out.
    jmjoseph's Avatar
    jmjoseph Posts: 2,727, Reputation: 1244
    Ultra Member
     
    #2

    Feb 20, 2010, 09:25 AM

    Is this in meters?

    You know what the invert is, right? It is the lowest point of flow if only one measurement is given.

    The hole depth depends on what type of manhole structure it is that you are installing. i.e. poured, or prefabricated.
    esk1705's Avatar
    esk1705 Posts: 4, Reputation: 1
    New Member
     
    #3

    Feb 20, 2010, 09:34 AM

    Yes in meters. and it is a plastic prefabricated manhole.
    esk1705's Avatar
    esk1705 Posts: 4, Reputation: 1
    New Member
     
    #4

    Feb 20, 2010, 09:36 AM
    Quote Originally Posted by esk1705 View Post
    yes in meters., and it is a plastic prefabricated manhole.
    aa
    esk1705's Avatar
    esk1705 Posts: 4, Reputation: 1
    New Member
     
    #5

    Feb 20, 2010, 09:48 AM
    Quote Originally Posted by jmjoseph View Post
    Is this in meters?

    You know what the invert is, right? It is the lowest point of flow if only one measurement is given.

    The hole depth depends on what type of manhole structure it is that you are installing. ie poured, or prefabricated.
    Yes it is in meters and the manhole is prefabricated. Kind regards
    jmjoseph's Avatar
    jmjoseph Posts: 2,727, Reputation: 1244
    Ultra Member
     
    #6

    Feb 20, 2010, 01:38 PM

    Sorry, do you have a cross section of what is to be placed under the prefab structure? Say sand or gravel. Take the invert elevation, and subtract the remaining structure dimension, and add to that the base dimension. That is your hole depth. Say for instance the invert is 10" higher than the structure bottom, and the prepared base is 12" of sand, and 6" of gravel. The bottom of hole elevation is the invert elevation minus the 28".

    I will try to help you more later tonight when I return home.
    jmjoseph's Avatar
    jmjoseph Posts: 2,727, Reputation: 1244
    Ultra Member
     
    #7

    Feb 20, 2010, 04:56 PM

    OK, the invert elevation is 36.320M. and the top of rim elevation is 37.485M. So, that makes the dimension from top to bottom, 1.165M. In order to calculate the bottom of hole needed, you need to know the dimensions I referenced before, the structure dimension, from invert to bottom, and the base required.

    I hope this helps you somehow. If you need more, please come back here.

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search


Check out some similar questions!

Civil engineering company profile [ 0 Answers ]

What are the relevant items on civil engineering profile. What web site can I get details of civil engineering design.

How is trigonometry used in civil engineering? [ 2 Answers ]

how is trigonometry used in civil engineering? why and how does it help? :confused:

Civil engineering software [ 2 Answers ]

What software and programs do civil engeneers use? I'm planning on going to Ohio University for civil engineering? I was also wondering if you can get a good job doing land surveying after I graduate or during and if that pays good?

Civil engineering [ 2 Answers ]

How a bridge on the sea or a river is build still having a lot of water?if web page aviable please send me?


View more questions Search