 Design Engineer... righttttttt. Not. Thanks for the links though.
I've already stubbed out the connections for the new horizontal closed loop. I'll be using 1 1/4 inch black poly pipe... the medium thickness stuff. I have over two acres area to dig the trench, and I'm borrowing a backhoe from a friend, and yes, I've been a remodeling contractor for years and have driven a backhoe. I also know the HeatPump is a 4 ton unit. 
My question is, how long do I need to dig the trench and how much poly pipe do I need to lay? 1000 feet?
I live near Chicago, IL and our frost line is 2 - 3 feet deep. Actually, it rarely gets below 1 foot... but it has happened.