    Basement plumming
    I'm wanting to finish my basement with a toilet, sink and shower. The problem is that my basement doesn't have a rough-in. Any guidance on how I could make this happen would be greatly appreciated. Thank you.
    speedball1's Avatar
    speedball1 Posts: 29,301, Reputation: 1939
    Eternal Plumber
     
    #2

    Jul 27, 2008, 04:20 PM
    Hi Darren,
    The hardest part about installing a bathroom in a "add on remodel job" is the drainage and venting. The floor has to be jackhammered up and the sewer main located. Then after you branch off the main you have to jackhammer the cement up and trench to pick up each fixture. Water will also have to connected and laid in the trenches to supply the fixtures. Once the floor's up and the trenches dug here's what will happen. Toilet connects to sewer main. Lavatory connects to toilet drain and runs a vent off the top the stubout tee out the roof or revents back into a dry vent in the attic.. The toilet wet vents through the lavatory vent and the shower connects to the lavatory drain and is wet vented by it. This is a normal rough in and is acceptable both by local and state codes and also The Standard Plumbing Code Book in 90 percent of the country. Check your local codes to make sure you're not in the excluded 10 percent.. The vent off the lavatory may be run out the roof or revented back into a dry vent in the attic or if you're reventing back into a fixtures dry vent you must make your connection at least 6 inches over that fixtures flood rim. Then the basement floor will have to be patched and tiled over to hide the patches. I hope I've given you a little clearer picture of what's involved and thank you for rating my reply. Tom

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Plumming new construction [ 4 Answers ]

I have spent the last 5 years building my own home. It is at 95 % complete. Time to do some plumbing! I have kitchen sink, toilet, airtub, shower, vanity and on demand hot water heater. I am committed to seeing this through to the end. The code here is non existent, but want to do it right. I am...

Basement Plumming [ 3 Answers ]

Hi... I will soon be adding a bathroom to my basement.It will consist of a toilet, vanity sink, clothes washing machine and a corner stand up shower.My existing main vent stack is 3 inch copper venting through the house roof.Two feet from where the vent goes into the cement basement floor to join...

Plumming [ 2 Answers ]

When I flush the toilet I get bubbles the water drains slowly,sometimes the toilet overflows, I don't believe or know of an obstacle in the line, other times I flush the bubbles are few and the toilet seem fine,, I live in a home with one toilet, this problem has bee going on for about two weeks.

Bathroom Plumming [ 1 Answers ]

Our bathroom is on the second floor of our house above the kitchen. Every time someone takes a shower it leaks through the ceiling, down the cupboards and on the kitchen counter. We tried re cocking, we have lessened the pressure of the shower and well as different angles to have the shower head....

Rough Plumming [ 2 Answers ]

I Am Putting A Bathroom In My Basement. I Am Curious How Far The Closet Flange Should Be From The Back Wall And Does It Have To Be Flush With The Concrete. I Have The Old Concrete Cut Out Where The New Pvc Pipes Are And I Want To Make Sure I Have Everything In The Right Place Before I Fill The...