    Soil and waste
    How do you test soil pipe and waste system on new build house to comply with completion regulations
    ballengerb1's Avatar
    ballengerb1 Posts: 27,378, Reputation: 2280
    Home Repair & Remodeling Expert
     
    #2

    Apr 24, 2008, 05:30 PM
    9 reads and no reply, that should improve when we move this to plumbing
    Fr_Chuck's Avatar
    Fr_Chuck Posts: 81,301, Reputation: 7692
    Expert
     
    #3

    Apr 24, 2008, 07:00 PM
    Moved to plumbing
    massplumber2008's Avatar
    massplumber2008 Posts: 12,832, Reputation: 1212
    Senior Plumbing Expert
     
    #4

    Apr 25, 2008, 04:24 AM
    Hi Plumb1...

    Basically, you cap all waste lines, you cap main drain (or install cherne test ball into main cleanout)... then you either fill the entire system with water until flows out the vent in the roof... OR, you cap the vent through the roof and pump the system up with air.

    You can also test in sections, as long as when using the water test you test to a 10 foot head (means that you need to fill pipes under test to 10 feet above lowest level)... if air, just test normal.

    The air test will require a certain PSI (POUNDS PRESSURE/SQUARE INCH) to be held for a certain amount of time... YOU MUST CALL YOUR LOCAL PLUMBING INSPECTOR AND ASK HIM WHAT PSI AND FOR HOW LONG TEST MUST HOLD IF USING AIR IN YOUR TOWN.

    Each state has its own requirements. I always test with water... ;)

    Cap all lines with jim caps (see pic.) or install cherne test balls or similar (pump up with bicycle pump... see pic.).

    They also make jim caps (test caps) with drains in them... makes emptying system at base of system much easier to drain (other option is to pull test plug or just pull cap off... both can be messy. This works great!).

    I'm afraid that's how it's done... any more questions, let us know... Mark

    .
    Attached Images
       
    speedball1's Avatar
    speedball1 Posts: 29,301, Reputation: 1939
    Eternal Plumber
     
    #5

    Apr 25, 2008, 04:42 AM
    In our area we cap off all the drainage in the unit and place a inflatable test ball in the cleanout to complete the seal. We then take a hose up on the roof and fill the job from the highest roof vent. When the vent runs over we let it set overnight and call in a inspection. This is called a "static test". Regards, Tom

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Sink waste water and soil stack [ 1 Answers ]

In general--but with particular reference to New York City--does kitchen sink waste water empty into a standard soil stack?

Connecting second floor waste to main waste stack? [ 3 Answers ]

I have new new modular cape that had the first floor plumbing complete, and the second floor stubbed, and want to know the right way to connect the second floor waste drain which was installed in the house, to the main waste drain. The main waste drain comes up verically from the basement floor...


View more questions Search