Not your question?
Ask your question
View similar questions
Add your answer here.Check out some similar questions!
Toilet flange level for installation
[ 3 Answers ]
I am installing a toilet in new construction where the flange is set at the subfloor level and slightly below (about 3/8") the level of the hardwood flooring. Does the flange have to be raised to the level of the finished floor? If so, how?
Toilet flange installation
[ 2 Answers ]
I am installing a new bathroom in the basement that was rough in by the plumber. I have a cast iron pipe for the toilet rough in. What do I use to cut the cast iron pipe to the correct height, and what is the correct height. I am also installing ceramic tile to the floor. Do I install the flange on...
Cast iron toilet flange the bolt holes will not hold how do we fix it and the flange
[ 1 Answers ]
We have a cast iron flange and the bolt holes are not useable can we cut off the top and add a new plastic flange
Offset Closet Flange Installation
[ 1 Answers ]
Installing a toilet in a new basement bathroom. Center of 4: PVC drain pipe is 13.5" from the wall, so I tried to use an offset flange, made by Oatey Caspers. It was a snug fit, so I did some sanding with sandpaper and emery cloth, applied the cement and tapped it down, but could not get it in... View more questions Search
|