Ask Experts Questions for FREE Help !
Ask
    gtcmap1's Avatar
    gtcmap1 Posts: 3, Reputation: 1
    New Member
     
    #1

    Nov 13, 2007, 08:38 AM
    Basement bathroom install, testing supply lines
    Need some help. I'm a novice at plumbing but pretty handy.
    I am installing a bathroom in my basement.

    I will be tee-ing off the main 3/4" copper supply lines with 3/4" CPVC via sharkbite connectors. The 3/4" lines will feed cold and hot water to the bathroom. Here they will be split to 1/2" cpvc to supply the sink, toilet and bath/shower.

    At this point the tub is installed and the waste drain connected and tested. I need to stub out the sink supplies, toilet supply and install the shower mixing valve.

    When I get all these put in I want to test the lines for leaks before putting drywall up.

    What is the best way to do this "leak test". I can cap the sink and toilet supplies and cap the tub/shower outlets.

    1. When I turn the water supply on, how do I clear the air from the new bathroom supply lines?

    2. Should I put shut-off valves on the lines where I connect to the current copper lines?

    Most of the lines will be behind a drop ceiling, except where they have to go in the walls for the sink, toilet, and tub.

    Any advice or recommendations would be appreciated.

    Thanks,
    Chad
    gtcmap1's Avatar
    gtcmap1 Posts: 3, Reputation: 1
    New Member
     
    #2

    Nov 14, 2007, 07:32 AM
    Does anyone have any ideas that may help me proceed?
    ballengerb1's Avatar
    ballengerb1 Posts: 27,378, Reputation: 2280
    Home Repair & Remodeling Expert
     
    #3

    Nov 14, 2007, 08:41 AM
    Hey Chad, you can put caps on your lines, just leave them an inch too long because you will need to cut the CPVC to remove them. Don't worry about about air, if you have a leak anywhere the sir will leak out rapidly and then you will see water dripping, or gushing. Put stop cocks on your sink and toilet supplies but not back where the coopper connects to CPVC, stops go on right after the suplly lines come out of the wall into the bathroom.
    gtcmap1's Avatar
    gtcmap1 Posts: 3, Reputation: 1
    New Member
     
    #4

    Nov 14, 2007, 08:46 AM
    I was only concerned about putting a valve in the line to the bathroom in order to be able to only shut off water supply to that room when working, instead of the whole house. And if there was a leak detected during testing (as long as it was paste the valve), I could leave the rest of the house operational while repairing. Don't I need to give the cpvc cement time to dry before returning water supply. It was just a thought to keep wife and kids off my back about water supply.
    ballengerb1's Avatar
    ballengerb1 Posts: 27,378, Reputation: 2280
    Home Repair & Remodeling Expert
     
    #5

    Nov 14, 2007, 08:59 AM
    The cure time for CPVC glue can be 4-5 hours beore it reaches 100% so take your time. If you just want to isolate the room then you can installthose extra stops and you could then skip the stpos under the sink. However, the cure time is still 4-5 hours. Do it late at night, they'll never know.

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Connecting Copper Supply Lines to Brass Supply Lines [ 3 Answers ]

I have just started remodeling my kitchen and am looking to move my kitchen sink further down the wall. The kitchen is completely gutted at this point. The supply lines in my house are all brass. I'm looking to stem off the brass lines using copper tubing. Is it possible to cut the brass supply...

Replacing two supply lines with one [ 4 Answers ]

Where can I find a table showing flow volume for water pipe? I'm replacing two iron 3/4" pipes with a single line - a second floor bath & I"m replacing the hot/cold with just a cold supply then splitting and doing a point of use water heater.

Basement bathroom install [ 1 Answers ]

Good day! I am going to try and install a bathroom in the basement. I will have to break up the concrete floor to run the new plumbing to the existing sewer line with proper venting. I work best when I have a diagram to follow. Does anyone have anything like that they can post or just a good...

New bathroom install in basement. General FAQ's [ 5 Answers ]

I recently committed to the wife for a new 1/2 bath in the basement. We purchased a SaniFlo Macerating Toilet and a standard sink/vanity for install. The room is prepped and I am moving onto the plumbing. We have a dis-agreement. A little help from anyone here would be nice! I have the sink...

Trying to install bathroom in basement [ 1 Answers ]

I am a rookie or novice person. I am good with instructions. I have an unfinished basement. In the basement, I have a full bath rough-in. I am looking for a good book to use as a guide on how to finish my bathroom. I am thinking of adding a full bath in the basement. I need guidance in what...


View more questions Search