Not your question?
Ask your question
View similar questions
Add your answer here.Check out some similar questions!
Flexible Budget
[ 1 Answers ]
What is its purpose? eliminate cyclical fluctuations in producation reports by ignoring variable costs compare actual and budgeted results at virtually every level of production reduce total time in preparing actual budget I think it is the second one, does a1 disagree?
Conduit requirements for basement wiring
[ 1 Answers ]
I am finishing a basement with stud wall and dry wall. Is there any need for conduit to carry the wires behind the dry wall? I know for an unfinished basement wiring below grade must be in conduit but must it if the walls are finished? Thanks Dschaar
Do I need conduit?
[ 4 Answers ]
I have a panel in my garage for my garage based workshop. I want to run a 220 volt circuit (have have the capacity in the panel to do so). My question is whether I need to run the wire inside conduit or can I run romex without conduit. The wire will be behind drywall the entire way so it will...
Conduit sizing?
[ 4 Answers ]
Hi all! I am relocating my breaker box approx 30 feet from its original location. Installing splice box in the old location for connections. My question is : I have 14 12-2 and 3 12-3 to pull from new box to splice box what size conduit do I need so not to worry about heat build up or de-rating...
Electrical conduit
[ 1 Answers ]
I am running a new exterior line to a carport to install two fluorescent lights in the ceiling of a "V" shaped aluminum 2 car carport. The underside of the carport reaches very hot temperatures during the summer months, metal parts are burning hot to the touch. I undersatnd I need to use exterior... View more questions Search
|