    Basement rough-in
    I am thinking about putting a shower, sink and toilet in my basement laundry area. There are no roughed in plumbing lines for this. In trying to decide on the location of my toilet versus the shower and sink, I need to know the order in which these three should tie in to one another before tying in to the main drainage line. Also, how do these three need to be vented? I will have to do some digging and obviously do not want to spend more than necessary.
    ballengerb1's Avatar
    ballengerb1 Posts: 27,378, Reputation: 2280
    Home Repair & Remodeling Expert
     
    #2

    Oct 30, 2007, 01:47 PM
    To do a good rough in we'll need Speedballs help and I was surprised he wasn't already here. My post puts you back at the head of the line and Tom will be herer shortly. Does your current sewer line exit through the wall or from below the floor and how far is this from the proposed site?
    danno's Avatar
    danno Posts: 2, Reputation: 1
    New Member
     
    #3

    Nov 1, 2007, 01:26 PM
    The sewer exits through the floor and I am proposing to put shower, sink and toilet relatively close to the main stack and over tha sewer line as it heads to the street.All three will be within 3-4 feet of the main stack and 2-3 feet at the most from the sewer line. If my stack is east and the sewer runs to the west, I want to put the sink on the immediate west side of the stack and then the shower drain within 3 feet of that,directly over the line as it runs west . The proposed toilet would then be about 2-3 feet directly North of the shower .
    speedball1's Avatar
    speedball1 Posts: 29,301, Reputation: 1939
    Eternal Plumber
     
    #4

    Nov 2, 2007, 10:17 AM
    We have a problem already.
    I want to put the sink on the immediate west side of the stack and then the shower drain within 3 feet of that,directly over the line as it runs west . The proposed toilet would then be about 2-3 feet directly North of the shower
    The sink will be fine connected to the stack as long as bit's vented to the outside or revented back into a dry vent. However you may not connect the shower directly over the main without separate vent for the shower.
    Most bathroom groups are roughed in like this.
    Toilet connects to sewer main . Lavatory connects to toilet drain and runs a vent off the top the stubout tee out the roof or revents back into a dry vent in the attic.. The toilet wet vents through the lavatory vent and the tub/shower connects to the lavatory drain and is wet vented by it. This is a normal rough in and is acceptable both by local and state codes and also The Standard Plumbing Code Book in 90 percent of the country. Check your local codes.to make sure you're not in the excluded 10 percent.. The vent off the lavatory may be run out the roof or revented back into a dry vent in the attic or if you're reventing back into a fixtures dry vent you must make your connection at least 6 inches over that fixtures flood rim.
    Let me hear your thoughts. Tomk

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Basement rough in [ 5 Answers ]

I would like to rough in plumbing in my basement for a full bath (toilet, sink, and shower). I live just outside of Chicago so I suspect the plumbing codes are the same as Chicago. Currently in my basement I have two sump pumps and pits, one pump takes care of the drainage around the foundation...

Basement rough [ 11 Answers ]

Hi there I have a question about 2 4" pipes coming out of basement slab... one is raised and on is flush... both ate capped and connect directly to street... I'm prettty sure raised one is clanot but not sure about other... both emmit strong gas when caps removed?

Basement rough-in [ 3 Answers ]

I've seen a few of the posts w/ similar topics, and I think I'm on the right track. Just looking for confirmation from some experts. The center of the tub rough in drain is about 15.5" from the wall I'm puttting in and about 2" from the back wall I'm set to screw down. Question is, will a std....

Basement rough in [ 3 Answers ]

Hi experts! I'm planning to add a bathroom in my basement but I'm confused about the existing rough in. I've attached two pictures that show the rough in from two different angles. There is one 3" PVC pipe that is about 17" from the wall so it can be used for the toilet. I'm confused about the...

How does this look for a basement rough in? [ 5 Answers ]

I love this board, everyone is so knowledgeable! This is my question. Here is a picture of my basement taken yesterday. My floor has not been poured yet. This is how they have my bathroom roughed out. Does it look OK, or do I need to tell my builder anything before he finishes the floor! Any...


View more questions Search