Ask Experts Questions for FREE Help !
Ask
    Stubits's Avatar
    Stubits Posts: 390, Reputation: 2
    Full Member
     
    #61

    Mar 12, 2009, 07:20 PM

    Absolutely not just about price, but these guys are known to be good and they are VERY local, which counts in an area like DC.

    I haven't asked him yet, but what are your thoughts on my offering to do some of the grunt work? Like breaking up the slab, digging the holes for the footer, etc? Do you think I'd save enough to make it worth it? Would you as a pro ever go for something like that? Or is it just foolish?
    21boat's Avatar
    21boat Posts: 2,441, Reputation: 212
    Ultra Member
     
    #62

    Mar 12, 2009, 07:32 PM

    I usually don't because I end up babysitting the customer and never gets paid for that. Ask him and see how much diff.
    Stubits's Avatar
    Stubits Posts: 390, Reputation: 2
    Full Member
     
    #63

    Mar 13, 2009, 12:55 PM

    Great. Thanks so much.

    I am planning to spend a good chunk of the weekend working on the project and of course I have a few more questions. Truly, thank you so much for your help. I appreciate your willingness to help me reason things out, and help me figure out where I should hire out.

    So, I will absolutely hire out all the masonry work, it doesn't make sense not to. I am planning to do the framing myself as we discussed. 1) What do you recommend as exterior sheathing (what material? What thickness? Etc?) 2) What do you recommend for the subfloor(what material? What thickness? Etc?)

    What are your thoughts on foam board insulation applied on top of the exterior sheathing? Obviously insulation is a good thing. Any thoughts?

    Ok, now for the roof. Thank you for walking me through how to frame a flat roof and the parapets, I think I've got that all figured out. I've been looking at different roofing options and it seems like the best option for me is EPDM. Given it is such a small area, I think I am will to take this on myself. It seems like is an easy to work with material. Any tips or hints on working with it?

    Also, do you suggest doing the roof or the siding first? Which works best?

    Thanks!
    21boat's Avatar
    21boat Posts: 2,441, Reputation: 212
    Ultra Member
     
    #64

    Mar 13, 2009, 06:34 PM

    As I recall you have 2x12 joist in main house. I mentioned 2x8s at the 5' layout and mentioned for you to go the 10' for solving the cantilever problem on the brick to siding. Since the original joist are 2x12s I would use the same since you are now going the 10' way. This makes a nice joist bay for mechanicals and drainage if that's the case here. Its not much more since its only 5' wide. OC for joist is 16". Use 3/4 tongue and grove for the sub floor. I use adhesive caulk to keep the squeaks out from joist to ply sub floor. Also install joist bridges between joist bays. The x look. You can buy them they are metal.

    So from inside out. Please use 2x6s for framing. then 1/2" OSB. House wrap over that. I would consider spray foam for the insulation for the walls.

    Compare Spray Foam | McGlaughlin Spray Foam Insulation

    It cost more but in these times saving Heat is a good move and the diff will come back quicker.

    Signed 21 Boat

    If I Helped To Answer Your Question Please Rate My Answer
    Stubits's Avatar
    Stubits Posts: 390, Reputation: 2
    Full Member
     
    #65

    Mar 13, 2009, 07:17 PM

    Thanks.

    Yes, I am absolutely planning on using 2x12 for the joists.

    On the subfloor, you apply the adhesive caulk (liquid nails?) to the joists, then lay down the subfloor and screw it down, right?

    I was going to install joist bridges, didn't know you could buy them pre-made. Thanks!

    As for framing the walls, what do you think if I frame the basement level in 2x6s and then the second and third levels in 2x4? Or, what about just framing the upper level in 2x4?

    I am thinking I will do ceiling joists on the upper level (so I can have a flat ceiling) and then roof rafters above. I will use 2x12s for the roof, right? How about for the ceiling joists, can I just do 2x6?

    Any idea what the cost difference is for spray foam? Is that something I can DIY?

    Any experience with EPDM or membrane roofing?
    21boat's Avatar
    21boat Posts: 2,441, Reputation: 212
    Ultra Member
     
    #66

    Mar 13, 2009, 09:12 PM
    Quote Originally Posted by ;
    Posting twice so it easier to go back to.
    ROOFING 2x10 Min rafters. The 2x10s are for the sole purpose of getting enough room for (R) value. (check your Geo) Just remember the insul can't touch the roof ply and a min 2" breath room is required. There are styro 'baffles" that will accomplish that and as the pitch increases it won't be nesscarry. Not sure of pitch here. 2x12s may be a have to for breathing. Bottom of roof "3rd floor ceiling can be 2x6s 16 OC. to carry drywall.

    Rafters 16" OC. Normally a roof is 24" OC. But yours is flat and 10 rafter and Heavy snow/ice load can happen. Its 5/8" exterior sheeting with the roof clips per rafter bay. The 30lb felt on that...

    Now for the rubber part. The smallest roll widths here is 10'. I know that sounds perfect for you but its not that way. You have to think of the parapet walls and that extra.

    Over the felt you will get a 1/2 4x8 board at the rubber roof supply house. It's a fiberboard. This is screwed down with metal caps that are about 3" round. Use their screws to do this. After that you need to lay out the rubber. Here I use a lot of 060 gage. I'm not there to measure up the rubber part but heres the application. Lay out the rubber dry and leave plenty enough room to go UP the parapet walls. 8" if you have that. There is a 'termination bar" that used to go over rubber on the parapet walls. They are Tap Con in. Leave a bit over that "bar" and cut excess rubber off after the tap con is done. this will be caulked there with SPM seal which is at the rubber supply house. You are going to over Lapp the rubber roof because of the 10' factor is going to be flipped. So count on the roof as 5' wide plus the walls it goes up. Leave enough to go over the edge of the 5' side and the other partial side. After the rubber is on install the drip edge. Over that you will either cut from left over rubber a 6' wide pieces. This will be laid from the top of the drip edge back. It needs to be glued down with "Lapp cement" glue. Its a contact cement. Sap a chalk line 6" away from drip edge and coat the cement there let it get barely tacky. Have ready the 6" piece that also has the same cement on it. Now install. The seam there is caulked with SPM seal. A nice bead.

    You will have a different cement for the rubber to the felt board. They best way to put down the rubber is half at a time. Lay it all out fold back half. Use roller to ally glue. Now do the half you folded back Let dry to almost no tack. Bend roll that folded half over glued felt board half. Do other side same way. If you have to overlap its 4" on the overlap. All overlaps require SPM seal "caulk"

    Always run rubber roof Under the drip edge, Not just to the edge of the roof. This insures that any water will have to run over or under the drip edge if the 6" rubber lap fails at the SPM seal there. I let extra and cut off after drip edge is put on.

    Signed 21 Boat

    If I Helped To Answer Your Question Please Rate My Answer
    21boat's Avatar
    21boat Posts: 2,441, Reputation: 212
    Ultra Member
     
    #67

    Mar 13, 2009, 09:27 PM

    Spray foam is tricky. Hiring a company is usually 3 times that in fiberglass. You can Do it on your own. First check with local fire/building codes on approved foam. There are many diff types. Here is a site for the DYI if you want to give it a go. I would practice with the spray "stuff" before doing the walls. A foam wall is so insulated and 'tight" blocks sound well.

    YouTube - Tiger Foam. Spray Foam Insulation | basement & crawl space.

    Tiger Foam | Spray Foam Insulation Kits

    Signed 21 Boat

    If I Helped To Answer Your Question Please Rate My Answer
    Stubits's Avatar
    Stubits Posts: 390, Reputation: 2
    Full Member
     
    #68

    Mar 13, 2009, 10:57 PM

    Ok, great.

    So, I will construct the 3rd floor ceiling using 2x6 and the construct the roof using either 2x10 or 2x12. Just to make sure I understand, the roof joists will terminate on the rim joist of the 3rd floor ceiling, right?

    I have read a lot of instruction guides on the EPDM roof, it actually seems pretty straight forward. Thanks for all the tips!

    So, for framing the walls, what do you think if I frame the basement level in 2x6s and then the second and third levels in 2x4? Or, what about just framing the upper level in 2x4? I need to maximize every inch in the bathrooms!

    Also, the 3rd floor bathroom will have an antique cast iron clawfoot tub which weighs close to 300 lbs. without water. So I need to sister the 2x12 joists or should they be sufficient?
    21boat's Avatar
    21boat Posts: 2,441, Reputation: 212
    Ultra Member
     
    #69

    Mar 14, 2009, 03:25 PM
    [QUOTE=;] the roof joists will terminate on the rim joist of the 3rd floor ceiling, right?/QUOTE]
    Personally I think of 2x4s as interior walls only. If you have to use 2x4s and code allows it I would defiantly use foam insul there.

    (TUB) I would maybe sister up 2 joist with a 2x8 for dead load of tub. Its only 10- for clear span. Normally that's not done but I have seen some sunken joist over may years of dead weight..

    NOTE: when you lay out the floor joist for the bathroom think of the toilet and tub drainage. To tweak a joist can save a major problem later. The toilet is the bigge. The "closet flange" for the toilet needs to be 12' from FINISH wall to center of toilet bolts. It seems to never fail we hit dead on a joist or on the side of a joist. They have Offset flanges to help get around that bu if a joist can be moved for layout since its only five feet wide not a biggie. You can chase out from another side of the 16 oc to accommodate.

    When laying out the roof and ceiling joist they will be offset from each other by 1 1/2" and nailed to the sides of each other.
    Stubits's Avatar
    Stubits Posts: 390, Reputation: 2
    Full Member
     
    #70

    Mar 16, 2009, 06:43 AM

    Thanks.

    I under stand the roof issue now, much better.

    Can I just get the double joist hangers and sister all of the tub level joists with 2x12?
    Stubits's Avatar
    Stubits Posts: 390, Reputation: 2
    Full Member
     
    #71

    Mar 22, 2009, 10:32 AM

    21 Boat-

    Ok, so I've run into a tiny problem, hoping your years of experience can help!

    I spoke with my neighbor yesterday about the project. He thinks it is a great idea, but he expressed some concern about my demo'ing the brick privacy wall that separates his back concrete landing from mine. The wall is built right on the property line, 4" of it are on his property and 4" of it are mine. The real problem is his now deceased mother had the wall built and so there is some sentimental value for him and his sister.

    We really like our neighbor and I understand the sentimental thing, both my parents are deceased. That said, we need to do something because it doesn't work the way it is now. I think legally we'd be fine demo'ing it, but that is an awfully crappy move, not to mention I will need access to his property during the construction phase, to put up side and the like, so I am not sure it would serve me well.

    Also, you'll notice from the photo I posted earlier that it has a bit of an odd shape and is just 6' high by about 7' in length. This will NOT be a load bearing wall, because as we've discussed, the joists, floor and roof will run the 10' span.

    So, a couple of ideas...

    1) It is a double wythe brick wall. It looks to have been constructed soundly, can I just build on top of it? My only concern is that it isn't tied into the vertical house wall in anyway except with a bit of mortar. Is this even possible? If so, there are certainly some issues, for sure, but is it even remotely possible. This method, however I think would actually reduce my costs, right?

    2) I suppose I could have my mason just reuse the brick and do that portion of the wall in a brick veneer. This method would certainly increase my costs, but not sure by how much. I plan on giving the mason a call to see. I am not sure if this is an acceptable solution for the neighbor, and depending on the added cost, might not be for me. (I am already planning on paying $600 to trim down his iron landing that encroaches on my property).

    So, what do you think? Do you have a preference one way or the other? Any suggestions I haven't hit on yet?

    I don't want this to look incredibly awkward, although truth be told, we won't really ever see this portion of it, just him. Also, I don't want to do anything that would weaken or threaten the structure, allow greater opportunity for water infiltration, etc. Ultimately our architect will design this, but I'd like to have some ideas. He overheard me talking to contractors and started asking questions, but other than the wall issue, he thinks it's great.

    Thanks!
    21boat's Avatar
    21boat Posts: 2,441, Reputation: 212
    Ultra Member
     
    #72

    Mar 24, 2009, 12:04 AM
    Quote Originally Posted by ;
    I am already planning on paying $600 to trim down his iron landing that encroaches on my property).The wall is built right on the property line, 4" of it are on his property and 4" of it are mine.
    Sorry to get back so late. If the wall is equal on both sides then that's a problem. If you build to the exact line then there will be 4" of brick in front of your wall. If you build on top of the existing wall then you will be over the line 4"

    I say get rid of that wall and flush it back to the alcove. Then add your addition. Brick veneer that side if it a big issue. At this point the wall is 4" into your line. I realize its a politically think and tread lightly.

    Explain that you need to tear down your side of the wall and the other side want set well so it makes sense to re do that wall and remove It to get a nice look on his side. Explain the 4" problem and the logic to remove it and make the job looked planned and has symmetry and not odd in material change on one side.
    Stubits's Avatar
    Stubits Posts: 390, Reputation: 2
    Full Member
     
    #73

    Mar 26, 2009, 05:46 AM

    21 Boat-

    Somewhere on here I saw you recommend Chicago Power Tools and Harbor Freight. I am going to need to stock up on some tools for this project including a miter saw (thinking about a 12" sliding compound miter saw), a right angle drill as well as some air nailers.

    Obviously I am not a pro, but will be using the tools for a bit more than making flower boxes.

    The prices seem great, would Chicago Power tools be a good way for me to go?
    21boat's Avatar
    21boat Posts: 2,441, Reputation: 212
    Ultra Member
     
    #74

    Mar 26, 2009, 12:08 PM

    Yes I been very happy with Chicago Power tool to price ratio. Harbor freight is great for small compressors and air line quick couples etc. I use them a lot for shipping tools to the Caribbean when I work down there. They have sales constantly and at my store they will offer the sale price and a any of there coupons for general percent off. I made a killing on the price for there largest electric concrete jack hammer and the hand drill attached concrete vibrator. Also I brought down an mud size SDS drill combo chipping hammer which works great for masonry demo and drilling for Tap Cons. Its not as hefty as our Bosch demo hammer we use in the states but that's only a demo hammer. Here some tools I bought over time there and recently.
    - Harbor Freight Tools - Quality Tools at the Lowest Prices
    - Harbor Freight Tools - Quality Tools at the Lowest Prices
    This is a drill hammer combo which I shipped to P.R. this year and it works well. This would help in brick pockets and clean up the demo of dividing wall where it meets the houses.
    - Harbor Freight Tools - Quality Tools at the Lowest Prices

    This is a tool to break up old floor but you should rent it. I use this in P.R. job sites
    - Harbor Freight Tools - Quality Tools at the Lowest Prices

    I never had a Bad power tool form harbor freight. They have some junk there but all in all they have good tools for the buck.
    Stubits's Avatar
    Stubits Posts: 390, Reputation: 2
    Full Member
     
    #75

    Mar 26, 2009, 12:14 PM

    Oh, so you own the 12" sliding compound miter saw? I was thinking of buying that. So, you'd recommend?

    And the air compressor, is that sufficient for framing?

    So, you do a lot of work in PR and the Carib? In my real job I study LatAm and the Caribbean for the government. Love it down there.
    21boat's Avatar
    21boat Posts: 2,441, Reputation: 212
    Ultra Member
     
    #76

    Mar 26, 2009, 02:35 PM

    Yes it was on sale about a in Feb. After I recommended it to a poster. The dual tank is sufficient for one air nailer. I have many diff compressors. From tow behinds to the dual tanks with the wheel to small dual tanks Like I posted for you to pancake compressors. I mostly use Pass loads for framing re haps and there finisher nailer. I bought form Harbor last summer the roofing nailer I was surprised how well it worked, I have the old Sencos framer and roofing nailer's but they are heavy and clunky to the modern versions.

    I have been working in construction on and off for 20+ years. The last project was a 3 story bed and breakfast. The common sense in construction down here is almost non existence. Also the locals here work from 7am to 1pm or so with a lunch brake. I was flown down just to hang commercial doors buy my customer. The workers here are about $90.00 a day and it was still cost effective for mu customer to fly me and some of my guys to do the thinking jobs,

    I could give you an earful on P.R. government.

    That's where I'm at now typing this. I winter in P.R. and work there.
    Stubits's Avatar
    Stubits Posts: 390, Reputation: 2
    Full Member
     
    #77

    Mar 26, 2009, 04:12 PM

    What do you think of this as a nailer?

    - Harbor Freight Tools - Quality Tools at the Lowest Prices
    21boat's Avatar
    21boat Posts: 2,441, Reputation: 212
    Ultra Member
     
    #78

    Mar 26, 2009, 04:29 PM

    The tank goes to 115 psi and the gun max is 120 psi. I never set a framer that high. Just cross check the volume which in think is fine here without actually looking as the compressor to double check, Of course both are at the store.
    Stubits's Avatar
    Stubits Posts: 390, Reputation: 2
    Full Member
     
    #79

    Mar 26, 2009, 04:30 PM

    Can I use the same nailer to install the exterior sheathing? Roof sheathing? Subfloor? Siding?
    21boat's Avatar
    21boat Posts: 2,441, Reputation: 212
    Ultra Member
     
    #80

    Mar 26, 2009, 07:13 PM
    Quote Originally Posted by ;
    Can I use the same nailer to install the exterior sheathing? roof sheathing? subfloor? siding?
    Yes for all except for the siding. I'm not familiar with hardi siding and that will be more than likely hand nailed.

    You will use different nails for the ext sheeting and use those same nails for subfloor.

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Insulation of flat roof [ 7 Answers ]

I just had the roof and plywood replaced over a 1950s addition. I exposed the rafters in the ceiling below. My question is, after I insulate with 6 1/2 kraft faced, what can I use for a vapor barrier, between insulation and sheetrock?

Tarping a flat roof [ 2 Answers ]

Hello need some help trying to tarp a flat roof with a/c unit on it what is the best was to stop water from coming in around the units don't want to cover the a/c unit they will burn up

Attach gable roof to flat roof [ 1 Answers ]

We are building a three season attached screenroom. We are uncertain how to attach the gable roof to the present roof (gabled in the opposite direction, so the attachment is on the flat side). We have spent hours trying to locate do it yourself instructions and can only find do it yourself kits...

Shingles not flat on new roof [ 5 Answers ]

Just had a new roof installed with all new plywood etc. Looks like a fine job except that most of the shingles do not lie 100%flat on the bottom. Someone told me that it's because the weather is still cold (it was installed beginning of December in NY) and that if it were warm, that the shingles...

Roof framing [ 1 Answers ]

How to lay out and cut roof rafters


View more questions Search