
Originally Posted by
broomy
(ferrule?? oakum?? This can't be good.)
How can I shorten the lead closet riser or can I remove it and put something else instead (i.e. deep pvc flange.)
(I never should have promised my wife to have this floor done by the weekend......)
Fortunately this is just a matter of shortening it -- Rather than extending it.
When you lay your tile backer board, cut or hole saw the tile backer board just big enough to slide around the lead sleeve -- You will need some surface area to screw the lead closet ring to, so don't make the hole too big.
Split the tile backer board down the center of the hole you cut and slide the two pieces under the brass closet ring and then finish your floor (thinset, tile etc).
When the floor is finished, attach the brass closet ring to the floor, there isn't much wood left under the tile backer, so you may want to use 1/4" plastic concrete anchors and stainless screws.
Once the brass ring is set (make sure the closet bolt holes are aligned correctly) it's just a simple matter of gently pounding the lead flat to the top of the brass ring with a ball peen hammer.