Adding bath drain in concrete for existing half bath
[ 1 Answers ]
I want to turn a half bath into a full bath in my basement. Currently the washer and dryer along with the water heater are in the half bath along with the commode and sink. I want to add a bath tub and the lay out of the room is such that the tub installation would probably require less work if it...
Feasibility of adding tub to existing basement bath rough-in
[ 2 Answers ]
Hello. I've spent hours reading through old posts on basement bathroom rough-ins, and I'm definitely more enlighted now than I ever was. But... I have no experience with plumbing and am not confident that I understand all the information I have found on this board well enough to be sure what I...
New bath on slab (tie into existing lines)
[ 3 Answers ]
I plan on adding another bath into an apartment I have attached to a hangar building. It has an existing septic system with a kitchen / bath and laundry on it now. I want to add a shower, toilet and lav to the new bath. This needs to function well, but there is no permit or inspection...
Cutting cement for plumbing 3/4 bath to full bath
[ 3 Answers ]
We are currently in the middle of changing our basement 3/4 bath into a full bath. The bathroom is 5.5' by 13.5'. We want to put the sink where the shower was and put a tub/shower where the sink was. (because the space where the shower was is too small for a tub). The old sink drain is centered 4...
Basement bath / kitchenette into existing rough-in
[ 2 Answers ]
Speedball1 wrote in a different thread: "Let me tell you how a typical basement bathroom group rough in goes down. 4" under the cement from the toilet to the main sewer. 2" from the lavatory to connect to the 4" toilet drain line. From the top of the lavatory stubout tee a vent line will be... View more questions Search
|