Not your question?
Ask your question
View similar questions
Add your answer here.Check out some similar questions!
Confusion About Concrete Patio Against House at Level of Walkout Basement
[ 1 Answers ]
I am planning on pouring a 14' by 24' concrete patio at the level of the walkout basement sliding door. The original grading of the house sloped from part way up the poured concrete foundation wall down about 22" to the small 2' by 6' patio at the door. After excavating this area I found the...
Garden Walkways
[ 2 Answers ]
Hi I have just laid a pea gravel walkway and did not realize how unstable and probably inconvient it is for a main walkway to the front door. Is there any way I could stabilize it or add concrete or a resin. Something that would take lots of traffic without creating a mess. Help please - money...
Concrete Patio Against House at Level of Walkout Basement
[ 1 Answers ]
I am planning on pouring a 14' by 24' concrete patio at the level of the walkout basement sliding door. The original grading of the house sloped from part way up the poured concrete foundation wall down about 22" to the small 2' by 6' patio at the door. After excavating this area I found the...
When I must fill the taxes
[ 1 Answers ]
When I must fill the paper taxes if I work with h2b visa?I have also a extension h2b visa;at end of fiscal year or at end of work contract?
Concrete house piers and footings
[ 2 Answers ]
Can concrete piers and footings be safely poured in wet saturated clay ground.Rain has occurred over last 2 weeks and is forecast on and off for next month. View more questions Search
|