Not your question?
Ask your question
View similar questions
Add your answer here.Check out some similar questions!
Toilet flange is not level to my finished floor
[ 5 Answers ]
Our powder room finished floor consists of the plywood sub floor on top of the concrete slab, with almost an inch thick, solid wood plank floor. We are not getting a good seal of the toilet on the wax ring. Seems to us that the flange needs to be higher? How do we do this? And is the flange...
Toilet flange 3/4" below finished floor.
[ 2 Answers ]
While replacing the flooring of a bathroom, I removed the toilet and found the flange mounted to the subfloor but below the chipboard and vinyl. I ripped up the chipboard and vinyl and put down plywood, cement board, and porcelain tile around the flange. Now, the top of the flange is just about...
Closet Flange too high over finished floor
[ 4 Answers ]
We have just finish renovating our bathroom and upon installing the toilet we realized the flange is too high above the finish tiled floor. The top of the flange is 7/8" above the floor. I am unable to find what the height should be anywhere, not even in installation guides. We don't want...
Toilet flange slightly canted, not level with finished floor
[ 2 Answers ]
Installed PVC closet flange 1/2 inch above concrete floor, allowing for quickset and ceramic tile installation. Due to the drain pipe pitch, the flange is slightly off-level and canted approximately 1/4" above the finished floor level. Will this be a problem for proper leveling and installation of...
Moving a toilet over an inch above an already finished floor
[ 1 Answers ]
I am replacing a toilet in my mother in laws house. Her original sewage pipe is cast iron set in a concrete foundtion. I have to move the toilet about 1and a half inches and I need to know how to do this. I was told that there was a way but I need to know how to do it. View more questions Search
|