    Denny asbestos removal company
    Denny Asbestos Removal Company removes potentially toxic asbestos insulation and related products from buildings. The company’s estimator has been involved in a long-simmering dispute with the on-site work supervisors. The on-site supervisors claim that the estimator does not adequately distinguish between routine work such as removal of asbestos insulation around heating pipes in older homes and nonroutine work such as removing asbestos-contaminated ceiling plaster in industrial buildings. The on-site supervisors believe that nonroutine work is far more expensive than routine work and should bear higher customer charges. The estimator sums up his position in this way: “My job is to measure the area to be cleared of asbestos. As directed by top management, I simply multiply the square footage by $4,000 per thousand square feet to determine the bid price. Since our average cost is only $3,000 per thousand square feet, that leaves enough cushion to take care of the additional costs of nonroutine work that shows up. Besides, it is difficult to know what is routine or nonroutine until you actually start tearing things apart.”

    To shed light on this controversy, the company initiated an activity-based costing study of all of its costs. Data from the activity-based costing system follow:

    Activity Cost Pool Activity Measure Total Activity
    Removing asbestos Thousands of square feet 550 thousand square feet
    Estimating and job setup Number of jobs 220 jobs*
    Working on nonroutine jobs Number of nonroutine jobs 30 nonroutine jobs
    Other (organization-sustaining
    And idle capacity costs) None Not applicable
    * The total number of jobs includes nonroutine jobs as well as routine jobs. Nonroutine jobs as well as routine jobs require estimating and setup work.

    Costs for the Year
    Wages and salaries $ 210,000
    Disposal fees 595,000
    Equipment depreciation 60,000
    On-site supplies 58,000
    Office expenses 200,000
    Licensing and insurance 378,000

    Total cost $ 1,501,000



    Distribution of Resource Consumption Across Activities
    Removing Asbestos Estimating and Job Setup Working on Nonroutine Jobs Other Total
    Wages and salaries 33 % 7 % 25 % 35 % 100 %
    Disposal fees 67 % 0 % 33 % 0 % 100 %
    Equipment depreciation 50 % 0 % 36 % 14 % 100 %
    On-site supplies 46 % 13 % 24 % 17 % 100 %
    Office expenses 6 % 31 % 25 % 38 % 100 %
    Licensing and insurance 42 % 0 % 37 % 21 % 100 %

    Required:
    1.
    Perform the first-stage allocation of costs to the activity cost pools. (Leave no cells blank - be certain to enter "0" wherever required. Omit the "$" sign in your response.)

    Removing
    Asbestos Estimating and
    Job Setup Working on
    Nonroutine Jobs Other Total
    Wages and salaries $ $ $ $ $
    Disposal fees
    Equipment depreciation
    On-site supplies
    Office expenses
    Licensing and insurance

    Total cost $ $ $ $ $


    2. Compute the activity rates for the activity cost pools. (Round your answers to 2 decimal places. Omit the "$" sign in your response.)

    Activity Cost Pool Activity Rate
    Removing asbestos $ per thousand square feet
    Estimating and job setup $ per job
    Working on nonroutine jobs $ per nonroutine job

    3.
    Using the activity rates you have computed, determine the total cost and the average cost per thousand square feet of each of the following jobs according to the activity-based costing system. (Round your intermediate and final answers to 2 decimal places. Omit the "$" sign in your response.)

    a. A routine 2,000-square-foot asbestos removal job.

    Total cost of the job $
    Average cost per thousand square feet $

    b. A routine 4,000-square-foot asbestos removal job.

    Total cost of the job $
    Average cost per thousand square feet $

    c. A nonroutine 2,000-square-foot asbestos removal job.

    Total cost of the job $
    Average cost per thousand square feet $
    paraclete's Avatar
    paraclete Posts: 2,706, Reputation: 173
    Ultra Member
     
    #2

    Nov 24, 2012, 12:32 AM
    Appears routine what do you want to know

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

How long do I need to move out of my house during asbestos celing removal? [ 2 Answers ]

Do I need to move out of my house while I have a popcorn ceiling removed?

Popcorn ceiling removal asbestos [ 1 Answers ]

Do all popcornceilings have asbestos? We bought the house 5 yrs. Ago it was build in 1977 and I startet to remove the popcornceiling,was not aware it could be a health problem.

Is it safe to live in a building while asbestos removal is being done? [ 1 Answers ]

My HUD privately owned apartment building is being rehabbed. Lots of asbestos removal is being done, especially "popcorn" asbestos ceilings. Empty apartments next to me have been done with exhaust blowers on a full 7 days. Now I find out that my belongings will stay in my apartment (covered) while...

Hardwood floor removal-asbestos [ 1 Answers ]

We have removed our carpet and have discovered old tile-like hardwood (9" x 9" squares). We haven't decided what to replace it with, but we're thinking of trying to refinish the wood. (Is it worth trying to fix?) A lot of the pieces are broken. Problem: It is painted (white and army green)......

Asbestos siding removal/covering [ 5 Answers ]

I have just purchased a home in Norfolk VA that has asbestos siding. I would like to find out if I can remove it, and replace with Certianteed siding panels, or can I place the panels directly on top of the original asbestos.


View more questions Search