Not your question?
Ask your question
View similar questions
Add your answer here.Check out some similar questions!
Can I Re-route Main Stack?
[ 7 Answers ]
I am trying to make a 2nd floor bathroom bigger by removing a wall and moving the fixtures around. I am going to tear up floor and ceiling as well. The wall I am removing has a maint stack that goes through to the roof. Question: Can I reroute the Connection from the floor to the roof by...
Half Bath Too Far From Main Stack
[ 15 Answers ]
My father-in-law and I are putting in a half bath on the main floor. The problem is, the location is too far from the main stack, about 15 feet or more. The idea we came up with (see image) is to tie into the sewer line (1) close to where it comes in from the outside. We would have to break into...
Can I move my main stack?
[ 3 Answers ]
Hi, I recently bought and older house (My first!) That was built in like 1954, now the bathroom is very small so I'm sort of relocating it. My question is can I move my main stack with 22.5 and 45 degree elbows or am I stuck with it coming up out of the soon to be dinning room floor? NOt sure of...
Possible Blockage Main Stack Vent
[ 1 Answers ]
The two toilets and the tub in the upstairs bathrooms are plugged and will not drain or flush. There is a gurgling sound when we flush or try to plunge the toilets. I have been told by a plumber that he thinks the main stack vent is blocked. How can I unstopped or clear the main stack vent? Are...
How do I tie into main vent stack?
[ 3 Answers ]
Are there any tricks to put a 3" Tee into the main vent stack to add a lavatory? I don't think I can lift the top part of the stack up or push the bottom part of the stack down once I cut it in half but I think I'll need to seperate it by something like 2" and then push it back together to have... View more questions Search
|