    What's the difficulty to add ejector pump in a basement with only a bath rough in?
    I'm looking to include a basement with a bathroom in my next build, but the builder doesn't include an ejector pump or rough in for water supply lines.

    What will this mean for me later when I finish the basement? Are we talking thousands of dollars (over $5000)?
    mygirlsdad77's Avatar
    mygirlsdad77 Posts: 5,713, Reputation: 339
    Plumbing Expert
     
    #2

    Mar 21, 2010, 05:07 PM

    I would suggest having the basement bath and sewer ejector roughed in before the basment concrete slab is poured. It will save you money when you do decide the finish the basement. If the slab is poured, then years later you decide to add a basement bathroom that requires a sewage ejector, yes, it may run upwards of 5000. When building a new home, it is very important to take all future work into account. Paying a little(or even a lot) extra now will save you thousands later.
    Many people never get the chance to build a new home, but the lucky ones that do need to really think about what they really want in a home. I hate to see people pay for a house to be built only to end up with something less than they dreamed of. Having a new house built is a once in a lifetime experience(for most), and it really pays to have all the things you want in a house done during the initial construction. Once initial construction is done, it can be very hard and expensive to add to the house, especially when it comes to basement plumbing(requireing breaking up of concrete). Good luck in the build, and I hope you enjoy your new home. Please keep us posted on progress.
    CHayn's Avatar
    CHayn Posts: 177, Reputation: 10
    Junior Member
     
    #3

    Mar 22, 2010, 03:41 AM

    Definitely have the DWV piped in underground. I assume your sewer will go out through your wall instead of under the footing since you mention an ejector pump. You will want the proper pit put in also at this point. A 30" deep pit is appropriate for a sewage ejector. Even if the builder wont put in the pump, be sure they leave an available 2" pipe for the pump to pump into and a 2" pipe for a vent.
    As far as the water lines go they are normally roughed in after you put up the stud walls for the bath.
    It seems odd to me that a builder wouldn't be happy to do the entire bath for you. Usually it is the extras that make them the big bucks!
    Be sure to give the builder or the plumber a detailed sketch of how you want the layout of the bath to go and where in the basement you want it!
    Good Luck!

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Sewage Ejector Pump in a Basement [ 9 Answers ]

Hello all I am new to this board so forgive me if this has already been asked. I am in the process of adding a basement to our basement. We have a septic system with the discharge pipe about 3 feet above the floor. Several questions. I want to add a Toilet, sink and tub. What all has to be vented....

Sewage Smell in Finished Basement with Ejector Pump [ 6 Answers ]

We have a sewage smell in our basement that we finished and added a bathroom. It has an ejector pump and we have sealed off the crock top with caulk and wax. The smell is not all the time and is very inconsistent. We have city sewage. We have tried everything with not luck. The only thing that we...

Ejector pump in the basement bahromm has a humming sound [ 1 Answers ]

I have a bathroom in the basement the toilet has an ejector pump. Recently it seems the there is a continuous humming sound from the ejector pump, si I unplugged it. At this time I do not have any water usgae and I am not using the basement bathroom. What seems to be the problem? Does the ejector...

Basement bath rough-in [ 1 Answers ]

Rough-in for bath has a 2in drain for the sink(vented), a 4in pipe in the floor 12in from the wall for the toilet and another 4in line 3ft from the back wall and 7ft from another wall. The 2in pipe has a T going over to the vicinity of the 2nd 4in pipe, down into the floor. #1 is the 2nd 4in line...