    Concrete Cure Time - before placing a hot tub on it
    I have a new concrete back patio. At some point we would like to place a hot tub on it. How long should we wait before doing something like that. The concrete pad is 4" thick, 3000 psi with rebar. How long should we wait to insure it has the time to fully cure before placing that much weight on it or covering an area that size.
    frankod's Avatar
    frankod Posts: 2, Reputation: 1
    New Member
     
    #2

    Nov 10, 2009, 10:42 AM
    Concrete cures for years but I've done concrete work and normally I tell folks allow 24 hrs for walking and 48 hrs for anything heavy such as your tub or in most of my cases autos or trucks. You can wait longer if you care to but 2 days is plenty.
    jmc1324's Avatar
    jmc1324 Posts: 20, Reputation: 2
    New Member
     
    #3

    Nov 10, 2009, 08:16 PM

    For a hot tub as frank said above 2 days should be OK to drive on at least a week, as for the 3000 psi why? I usually won't pour anything less the 4000 psi sidewalks patios floors or driveways, 3000 psi is footer grade mix.
    21boat's Avatar
    21boat Posts: 2,441, Reputation: 212
    Ultra Member
     
    #4

    Nov 11, 2009, 05:30 PM

    Frankford A little FYI
    Most concrete cures about 60 to 70% in two weeks at 70 Degrees. At this temp it takes a standard 30 days before any

    2 days is NOT long enough for trucks... Now if you use curing agents and keep moisture in and above 70 Degree then a shorter time in curing.
    jmc1324's Avatar
    jmc1324 Posts: 20, Reputation: 2
    New Member
     
    #5

    Nov 11, 2009, 06:47 PM

    21 boat you are correct and I forgot my "," as for the hot tub placement 2 days should be OK "," but to drive on at least one week
    When I need to drive on sooner than a week I use 4500 psi with a calcium non chloride I get 3850 psi test cylinder breaks in 3 days...

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Cure-time cpvc cement [ 5 Answers ]

I have finally found out (with help) that I need to use cpvc pipe and fittings to hook-up my bathtub/shower assembly, and also cpvc primer and cement (orange). 3 questions: Is there a cure-time for the orange cement (does not say on the can)? Is silicone caulk appropriate for seating the...

No hot water in master bath;scortching hot everywhere else. [ 2 Answers ]

OK here is my dilema.. I just purchased a newly built home. We are the 1st owners and everything was brand new.. appliances, furnace boiler etc; I have scortching hot water everywhere but my master bath. I have 2 flrs and 2 full baths. Bathroom on 1st floor has hot water enough to fog up...

Kitchen Aid Dishwasher - Water Level in tub [ 1 Answers ]

Have had new dishwasher installed. How can I tell how much water should be in the tub? I have looped the outlet hose under the counter as the user instructions say so it doesn't siphon yet it doesn't appear that there is enough water in the tub for the spray arms to rotate. The water float level is...

Converting shower stall to Bath tub rough-in [ 1 Answers ]

I have a walk-in shower on top of a concrete slab. I would like to install a 60" tub. Will there be a p- trap in the slab? Will it be located as such to line up with a tub? If not what will I need to do? Also please provide rough-in demensions for a 60'' tub

7 day notice w/out cure and payment eviction at the same time ? [ 7 Answers ]

It looks as if I may have found a solution to my eviction/ not paying rent problem.But I am not sure if I am allowed to do this. I intend on giving the person living at my home 3 days notice to pay rent. However I need him evicted immediately. I plan on using the 7-day notice without cure for this....


View more questions Search